An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Takane No.2 Dam is a hollow gravity dam located in Gifu Prefecture in Japan. The dam is used for power production. The catchment area of the dam is 173 km2. The dam impounds about 58 ha of land when full and can store 11927 thousand cubic meters of water. The construction of the dam was started on 1963 and completed in 1968.

Property Value
dbo:Infrastructure/length
  • 0.232 (dbd:kilometre)
dbo:abstract
  • Takane No.2 Dam is a hollow gravity dam located in Gifu Prefecture in Japan. The dam is used for power production. The catchment area of the dam is 173 km2. The dam impounds about 58 ha of land when full and can store 11927 thousand cubic meters of water. The construction of the dam was started on 1963 and completed in 1968. (en)
  • 高根第二ダム(たかねだいにダム)は、岐阜県高山市高根町日影地先、木曽川水系飛騨川に建設された発電専用ダムである。 (ja)
dbo:buildingStartDate
  • 1963
dbo:buildingStartYear
  • 1963-01-01 (xsd:gYear)
dbo:country
dbo:height
  • 69.000000 (xsd:double)
dbo:length
  • 232.000000 (xsd:double)
dbo:location
dbo:openingYear
  • 1968-01-01 (xsd:gYear)
dbo:part
dbo:wikiPageID
  • 71049599 (xsd:integer)
dbo:wikiPageLength
  • 1313 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1096735143 (xsd:integer)
dbo:wikiPageWikiLink
dbp:constructionBegan
  • 1963 (xsd:integer)
dbp:damHeight
  • 69m (en)
dbp:damLength
  • 232m (en)
dbp:location
  • Gifu Prefecture, Japan (en)
dbp:locationMap
  • Japan (en)
dbp:name
  • Takane No.2 Dam (en)
dbp:opening
  • 1968 (xsd:integer)
dbp:resCapacityTotal
  • 11927000 (xsd:integer)
dbp:resCatchment
  • 173 (xsd:integer)
dbp:resSurface
  • 58 (xsd:integer)
dbp:wikiPageUsesTemplate
dct:subject
georss:point
  • 36.029444444444444 137.46305555555554
rdf:type
rdfs:comment
  • Takane No.2 Dam is a hollow gravity dam located in Gifu Prefecture in Japan. The dam is used for power production. The catchment area of the dam is 173 km2. The dam impounds about 58 ha of land when full and can store 11927 thousand cubic meters of water. The construction of the dam was started on 1963 and completed in 1968. (en)
  • 高根第二ダム(たかねだいにダム)は、岐阜県高山市高根町日影地先、木曽川水系飛騨川に建設された発電専用ダムである。 (ja)
rdfs:label
  • 高根第二ダム (ja)
  • Takane No.2 Dam (en)
owl:sameAs
geo:geometry
  • POINT(137.46305847168 36.029445648193)
geo:lat
  • 36.029446 (xsd:float)
geo:long
  • 137.463058 (xsd:float)
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • Takane No.2 Dam (en)
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License