The Subansiri Lower Dam, officially named Subansiri Lower Hydroelectric Project (SLHEP), is an under construction gravity dam on the Subansiri River in North Eastern India. It is located 2.3 km (1.4 mi) upstream of Subansiri River on Arunachal Pradesh. Described as a run-of-the-river project by NHPC Limited, the Project is expected to supply 2,000 MW of power when completed. The project has experienced several problems during construction to include landslides, re-design and opposition. It was expected to be complete in 2018. It is notable that, if completed as planned, it will be the largest hydroelectric project in India.

Property Value
dbo:Infrastructure/length
  • 0.284
dbo:abstract
  • Die Lower-Subansari-Talsperre, offiziell genannt Lower Subansiri Hydroelectric Power Project (LSHEP), ist ein in Bau befindliches Talsperrenprojekt mit einer Gewichtsstaumauer als Absperrbauwerk am Subansiri, einem Nebenfluss des Brahmaputra, im Nordosten Indiens. Die Sperrstelle liegt 2,3 km stromaufwärts des Dorfes Gerukamukh im Distrikt Lower Subansiri im indischen Bundesstaat Arunachal Pradesh. An der Talsperre wird ein Laufkraftwerk gebaut, das nach Angaben des Bauherrn NHPC Limited eine Nennleistung von 2000 MW haben wird. An der elektrischen Leistung gemessen, soll sie das zweitgrößte Wasserkraftwerk Indiens nach der Tehri-Talsperre sein. Das Projekt sollte 2018 fertiggestellt werden, jedoch erlitt es während des Baus einige Rückschläge durch Erdrutsche, Umplanungen und politische Widerstände.Die Bauarbeiten begannen im Dezember 2007. Sie wurden im Dezember 2011 aufgrund der erwarteten Umweltbelastungen unterbrochen, aber im Jahre 2019 wieder aufgenommen. (de)
  • The Subansiri Lower Dam, officially named Subansiri Lower Hydroelectric Project (SLHEP), is an under construction gravity dam on the Subansiri River in North Eastern India. It is located 2.3 km (1.4 mi) upstream of Subansiri River on Arunachal Pradesh. Described as a run-of-the-river project by NHPC Limited, the Project is expected to supply 2,000 MW of power when completed. The project has experienced several problems during construction to include landslides, re-design and opposition. It was expected to be complete in 2018. It is notable that, if completed as planned, it will be the largest hydroelectric project in India. As of early 2019, work was not progressing on either of the two major dam projects in the Assam region, the Dibang and the Lower Subansiri. After clearance of ‘Subansiri Lower Project’ by Hon’ble NGT vide its Order dated: 31.07.2019, Main works of the Dam has been resumed on 15.10.2019. (en)
  • Le barrage du bas Subansiri est un barrage en construction entre l'Arunachal Pradesh et l'Assam en Inde sur le Subansiri. Il sera associé à une centrale hydroélectrique de 2 000 MW. Sa construction a débuté en 2007 (il est alors le plus important projet hydroélectrique d'Inde) et était toujours en cours en 2020. (fr)
  • ГЕС Субансірі – гідроелектростанція, що споруджується на сході Індії у штаті Аруначал-Прадеш. Використовуватиме ресурс із річки , котра дренує південний схил Гімалаїв та на рівнині Ассаму впадає праворуч до Брахмапутри. Для створення ГЕС в ущелині за пару кілометрів перед виходом Субансірі на рівнину зводять бетонну гравітаційну греблю висотою 130 метрів та довжиною 284 метри, яка потребуватиме 2,25 млн м3 матеріалу та утримуватиме сховище з об’ємом 1,37 млрд м3. Звідси ресурс спрямовуватимуть у прокладені через правобережний гірський масив підвідні тунелі довжиною від 608 до 1164 метрів та діаметром 9,5 метра, котрі через напірні водоводи довжиною від 400 до 485 метрів зі спадаючим діаметром від 9,5 до 7 метрів подаватимуть його до машинного залу. Основне обладнання станції становитимуть вісім турбін типу Френсіс потужністю по 250 МВт, які забезпечуватимуть виробництво 7,4 млрд кВт-год електроенергії на рік. Відпрацьована вода повертатиметься у річку через відвідний канал довжиною 35 метрів та шириною 206 метрів. Мінімальний рівень води у сховищі, при якому буде можлива робота ГЕС, становитиме 181 метр НРМ, тоді як рівень у нижньому б’єфі має коливатись між позначками 105 та 110 метрів НРМ. Первісно завершення проекту планували на 2009/2011 роки, проте станом на середину десятиліття термін зсунули вже на 2019/2020. При цьому з 2011-го роботи на будівельному майданчику призупинились через протести у штаті Ассам, з представниками якого ведуться тривалі переговори. (uk)
dbo:buildingStartDate
  • December 2007
dbo:buildingStartYear
  • 2007-01-01 (xsd:gYear)
dbo:description
  • Concrete gravity (en)
dbo:height
  • 116.000000 (xsd:double)
dbo:lake
dbo:length
  • 284.000000 (xsd:double)
dbo:location
dbo:owner
dbo:part
dbo:river
dbo:status
  • UC
dbo:thumbnail
dbo:volume
  • 2250000.000000 (xsd:double)
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 27381487 (xsd:integer)
dbo:wikiPageLength
  • 12850 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1121802168 (xsd:integer)
dbo:wikiPageWikiLink
dbp:carries
  • vehicles (en)
dbp:constructionBegan
  • December 2007 (en)
dbp:cost
  • Rs. 62.9 billion (en)
dbp:country
  • India (en)
dbp:damCrosses
  • Lower Subansiri River (en)
dbp:damType
  • Concrete gravity (en)
dbp:date
  • April 2021 (en)
dbp:imageCaption
  • Location of Lower Subansiri District, Arunachal Pradesh, and Assam Northeast India (en)
dbp:location
dbp:locationMap
  • India (en)
dbp:locationMapCaption
  • Location of the Subansiri Lower Dam in Arunachal Pradesh and Assam (en)
dbp:name
  • Subansiri Lower Dam bridge (en)
  • Subansiri Lower Project (en)
dbp:nameOfficial
  • Subansiri Lower Hydroelectric Power Project (en)
dbp:owner
dbp:plantAnnualGen
  • 7421 (xsd:integer)
dbp:plantCapacity
  • 2000.0
dbp:plantCommission
  • 2016 (xsd:integer)
dbp:plantOperator
dbp:plantTurbines
  • 8 (xsd:integer)
  • Francis-type (en)
dbp:spillwayType
dbp:status
  • UC (en)
dbp:updated
  • 2014 (xsd:integer)
dbp:website
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • 27.55361111111111 94.25861111111111
rdf:type
rdfs:comment
  • Le barrage du bas Subansiri est un barrage en construction entre l'Arunachal Pradesh et l'Assam en Inde sur le Subansiri. Il sera associé à une centrale hydroélectrique de 2 000 MW. Sa construction a débuté en 2007 (il est alors le plus important projet hydroélectrique d'Inde) et était toujours en cours en 2020. (fr)
  • Die Lower-Subansari-Talsperre, offiziell genannt Lower Subansiri Hydroelectric Power Project (LSHEP), ist ein in Bau befindliches Talsperrenprojekt mit einer Gewichtsstaumauer als Absperrbauwerk am Subansiri, einem Nebenfluss des Brahmaputra, im Nordosten Indiens. Die Sperrstelle liegt 2,3 km stromaufwärts des Dorfes Gerukamukh im Distrikt Lower Subansiri im indischen Bundesstaat Arunachal Pradesh. (de)
  • The Subansiri Lower Dam, officially named Subansiri Lower Hydroelectric Project (SLHEP), is an under construction gravity dam on the Subansiri River in North Eastern India. It is located 2.3 km (1.4 mi) upstream of Subansiri River on Arunachal Pradesh. Described as a run-of-the-river project by NHPC Limited, the Project is expected to supply 2,000 MW of power when completed. The project has experienced several problems during construction to include landslides, re-design and opposition. It was expected to be complete in 2018. It is notable that, if completed as planned, it will be the largest hydroelectric project in India. (en)
  • ГЕС Субансірі – гідроелектростанція, що споруджується на сході Індії у штаті Аруначал-Прадеш. Використовуватиме ресурс із річки , котра дренує південний схил Гімалаїв та на рівнині Ассаму впадає праворуч до Брахмапутри. Первісно завершення проекту планували на 2009/2011 роки, проте станом на середину десятиліття термін зсунули вже на 2019/2020. При цьому з 2011-го роботи на будівельному майданчику призупинились через протести у штаті Ассам, з представниками якого ведуться тривалі переговори. (uk)
rdfs:label
  • Lower-Subansiri-Talsperre (de)
  • Barrage du bas Subansiri (fr)
  • Subansiri Lower Dam (en)
  • ГЕС Субансірі (uk)
owl:sameAs
geo:geometry
  • POINT(94.258613586426 27.553611755371)
geo:lat
  • 27.553612 (xsd:float)
geo:long
  • 94.258614 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:homepage
foaf:isPrimaryTopicOf
foaf:name
  • Subansiri Lower Project (en)
  • Subansiri Lower Hydroelectric Power Project (LSHEP) (en)
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License