An Entity of Type: PowerStation103996655, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Seli Hydroelectric Plant aims to provide 400 megawatts (540,000 hp) of hydro electric power in Lahaul & Spitidistrict, Himachal Pradesh, India. The project has been awarded to Moser Baer through the international competitive bidding process. The project component comprises a concrete gravity dam of about 80 metres (260 ft) height above river bed level with two head race tunnels of approximately 4.2 km and an underground powerhouse complex on the right bank of river Chenab. Power would be generated by harnessing 114.92 metres (377.0 ft) average gross head between intake and tail race location.

Property Value
dbo:abstract
  • The Seli Hydroelectric Plant aims to provide 400 megawatts (540,000 hp) of hydro electric power in Lahaul & Spitidistrict, Himachal Pradesh, India. The project has been awarded to Moser Baer through the international competitive bidding process. The project component comprises a concrete gravity dam of about 80 metres (260 ft) height above river bed level with two head race tunnels of approximately 4.2 km and an underground powerhouse complex on the right bank of river Chenab. Power would be generated by harnessing 114.92 metres (377.0 ft) average gross head between intake and tail race location. (en)
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 36653473 (xsd:integer)
dbo:wikiPageLength
  • 1910 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1116327883 (xsd:integer)
dbo:wikiPageWikiLink
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • The Seli Hydroelectric Plant aims to provide 400 megawatts (540,000 hp) of hydro electric power in Lahaul & Spitidistrict, Himachal Pradesh, India. The project has been awarded to Moser Baer through the international competitive bidding process. The project component comprises a concrete gravity dam of about 80 metres (260 ft) height above river bed level with two head race tunnels of approximately 4.2 km and an underground powerhouse complex on the right bank of river Chenab. Power would be generated by harnessing 114.92 metres (377.0 ft) average gross head between intake and tail race location. (en)
rdfs:label
  • Seli Hydroelectric Plant (en)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License