The Seli Hydroelectric Plant aims to provide 400 megawatts (540,000 hp) of hydro electric power in Lahaul & Spitidistrict, Himachal Pradesh, India. The project has been awarded to Moser Baer through the international competitive bidding process. The project component comprises a concrete gravity dam of about 80 metres (260 ft) height above river bed level with two head race tunnels of approximately 4.2 km and an underground powerhouse complex on the right bank of river Chenab. Power would be generated by harnessing 114.92 metres (377.0 ft) average gross head between intake and tail race location.