dbo:abstract
|
- Salt Lake Sector – V (also known as Bandhan Bank Salt Lake Sector-V) is a station of the Kolkata Metro close to Nabadiganta Industrial Township, Salt Lake City, Kolkata, India. This metro station will be for Kolkata Metro Line 2 and Kolkata Metro Line 6. The construction of station for the Line 2 is complete and it has been inaugurated in February 2020 while that of Line 6 is in progress. The stations of Line 2 and Line 6 will be connected by over-bridge. (en)
|
dbo:address
|
- Sector – V, Salt LakeBidhannagar, Kolkata– 700091 (en)
|
dbo:isHandicappedAccessible
| |
dbo:numberOfPlatformLevels
| |
dbo:numberOfTracks
|
- 4 (xsd:nonNegativeInteger)
|
dbo:openingDate
| |
dbo:openingYear
| |
dbo:owner
| |
dbo:owningOrganisation
| |
dbo:railwayPlatforms
| |
dbo:stationStructure
|
- Elevated (Green Line)
- Elevated (Orange Line)
|
dbo:thumbnail
| |
dbo:type
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 7334 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbo:yearOfElectrification
| |
dbp:ada
| |
dbp:address
|
- Sector – V, Salt Lake Bidhannagar, Kolkata – 700091 (en)
|
dbp:electrified
| |
dbp:imageCaption
|
- Sector V, Metro Station (en)
|
dbp:levels
| |
dbp:mapDotLabel
| |
dbp:mapSize
| |
dbp:mapState
| |
dbp:mapType
| |
dbp:name
|
- 50 (xsd:integer)
- Salt Lake Sector V (en)
|
dbp:opened
|
- 0001-02-13 (xsd:gMonthDay)
|
dbp:operator
| |
dbp:otherName
|
- Bandhan Bank Salt Lake Sector V (en)
|
dbp:owned
| |
dbp:platform
| |
dbp:structure
| |
dbp:style
| |
dbp:tracks
| |
dbp:type
|
- Kolkata Metro station (en)
|
dbp:wikiPageUsesTemplate
| |
dcterms:subject
| |
georss:point
| |
rdf:type
| |
rdfs:comment
|
- Salt Lake Sector – V (also known as Bandhan Bank Salt Lake Sector-V) is a station of the Kolkata Metro close to Nabadiganta Industrial Township, Salt Lake City, Kolkata, India. This metro station will be for Kolkata Metro Line 2 and Kolkata Metro Line 6. The construction of station for the Line 2 is complete and it has been inaugurated in February 2020 while that of Line 6 is in progress. The stations of Line 2 and Line 6 will be connected by over-bridge. (en)
|
rdfs:label
|
- Salt Lake Sector-V metro station (en)
|
owl:sameAs
| |
geo:geometry
|
- POINT(88.429824829102 22.581317901611)
|
geo:lat
| |
geo:long
| |
prov:wasDerivedFrom
| |
foaf:depiction
| |
foaf:isPrimaryTopicOf
| |
foaf:name
|
- Salt Lake Sector V (en)
- 50px40px (en)
|
is dbo:routeEnd
of | |
is dbo:wikiPageRedirects
of | |
is dbo:wikiPageWikiLink
of | |
is dbp:end
of | |
is foaf:primaryTopic
of | |