Ruieni Hydro Power Plant is a large power plant on the Sebeş River situated in Romania. The project was started and finished in the 1990s and it was made up by the construction of a rockfill with a clay core dam 125 m high which was equipped with two vertical turbines, the hydropower plant having an installed capacity of 153 MW. The power plant generates 130 GWh of electricity per year.

Property Value
dbo:abstract
  • Ruieni Hydro Power Plant is a large power plant on the Sebeş River situated in Romania. The project was started and finished in the 1990s and it was made up by the construction of a rockfill with a clay core dam 125 m high which was equipped with two vertical turbines, the hydropower plant having an installed capacity of 153 MW. The power plant generates 130 GWh of electricity per year. (en)
  • ГЕС Руйєні — гідроелектростанція у південно-західній частині Румунії, в повіті Караш-Северін (історичний регіон Банат). Для спорудження водосховища станції обрали річку Bistra Mărului, ліву притоку річки Bistra (остання в свою чергу впадає справа у річку Тіміш, ліву притоку Дунаю). Тут спорудили кам'яно-накидну греблю із глиняним ядром висотою 125,5 метра та довжиною 408 метрів, на спорудження якої пішло 5,3 млн м3 матеріалу. Враховуючи характеристики місцевих порід, під її основою створили водонепроникну завісу, яка сягає глибини 65 метрів. Гребля утримує водосховище із площею поверхні 1,25 км2 та об'ємом 96 млн м3. Для збору додаткового ресурсу спорудили водозбірний тунель довжиною 16 км, який постачає воду із згаданої вище річки Bistra, а також із потоків Lupului, Bucova, Marga та Niermeş. Машинний зал розташували під гірським масивом в долині річки Себеш — ще однієї правої притоки Тімішу. Від греблі до нього веде тунель довжиною 9,8 км та діаметром 5 метрів, який на своєму шляху через спеціальні шахти приймає воду із потоків Bratonea та Slatina, а також із другого водозбірного тунелю, який живиться від згаданого вище Себешу та потоків Cuntu, Rîul Mic, Pietroasa, Pietroşiţa, Borlova, Borloviţa та Slătinei. Після системи із двох балансуючих камер (верхньої та нижньої, з'єднаних вертикальною шахтою) основний дериваційний тунель переходить у напірний водовід довжиною 0,5 км. Така схема забезпечує максимальний напір у 356 метрів. Підземний машинний зал має розміри 64х16 метрів та висоту 38 метрів, при цьому до нього можливий доступ через автомобільну галерею із невеликим нахилом довжиною 0,9 км. Основне обладнання становлять дві турбіни типу Френсіс, які мають загальну потужність у 140 МВт. Відпрацьована вода відводиться у річку Себеш. (uk)
dbo:country
dbo:lake
dbo:location
dbo:part
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 15059111 (xsd:integer)
dbo:wikiPageLength
  • 5666 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 968372980 (xsd:integer)
dbo:wikiPageWikiLink
dbp:country
dbp:location
  • Turnu Ruieni, Romania (en)
dbp:plantName
  • Ruieni Hydroelectric Power Station (en)
dbp:resName
  • Ruieni (en)
dbp:wikiPageUsesTemplate
dbp:wordnet_type
dct:subject
gold:hypernym
rdf:type
rdfs:comment
  • Ruieni Hydro Power Plant is a large power plant on the Sebeş River situated in Romania. The project was started and finished in the 1990s and it was made up by the construction of a rockfill with a clay core dam 125 m high which was equipped with two vertical turbines, the hydropower plant having an installed capacity of 153 MW. The power plant generates 130 GWh of electricity per year. (en)
  • ГЕС Руйєні — гідроелектростанція у південно-західній частині Румунії, в повіті Караш-Северін (історичний регіон Банат). Для спорудження водосховища станції обрали річку Bistra Mărului, ліву притоку річки Bistra (остання в свою чергу впадає справа у річку Тіміш, ліву притоку Дунаю). Тут спорудили кам'яно-накидну греблю із глиняним ядром висотою 125,5 метра та довжиною 408 метрів, на спорудження якої пішло 5,3 млн м3 матеріалу. Враховуючи характеристики місцевих порід, під її основою створили водонепроникну завісу, яка сягає глибини 65 метрів. Гребля утримує водосховище із площею поверхні 1,25 км2 та об'ємом 96 млн м3. Для збору додаткового ресурсу спорудили водозбірний тунель довжиною 16 км, який постачає воду із згаданої вище річки Bistra, а також із потоків Lupului, Bucova, Marga та Nierm (uk)
rdfs:label
  • Ruieni Hydroelectric Power Station (en)
  • ГЕС Руйєні (uk)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License