The Ruby Pipeline is a 42-inch (1,100 mm) natural gas pipeline running from Opal, Wyoming, to Malin, Oregon. The route crosses Northern Utah, and Northern Nevada. Ruby Pipeline, L.L.C. filed an application with the Federal Energy Regulatory Commission (FERC) on January 27, 2009, authorizing the construction and operation of the Ruby Pipeline Project. On April 5, 2010, the FERC approved the application. Construction began on July 31, 2010, and the pipeline was placed in service on July 28, 2011. The pipe is 680 miles (1,090 km) long with an expected capacity of 1.5 billion cubic feet per day (42×106 m3/d).

Property Value
dbo:abstract
  • The Ruby Pipeline is a 42-inch (1,100 mm) natural gas pipeline running from Opal, Wyoming, to Malin, Oregon. The route crosses Northern Utah, and Northern Nevada. Ruby Pipeline, L.L.C. filed an application with the Federal Energy Regulatory Commission (FERC) on January 27, 2009, authorizing the construction and operation of the Ruby Pipeline Project. On April 5, 2010, the FERC approved the application. Construction began on July 31, 2010, and the pipeline was placed in service on July 28, 2011. The pipe is 680 miles (1,090 km) long with an expected capacity of 1.5 billion cubic feet per day (42×106 m3/d). (en)
  • Ruby pipeline — газопровід напрямку схід — захід, що зв'язує газові хаби Опал (штат Вайомінг) та Малін (штат Орегон). На початку 2010-х басейни Скелястих гір давали п'яту частину видобутку природного газу в США. Розташований у басейні Грейт Грін Рівер хаб Опал забезпечує з'єднання між трубопровідними мережами Wyoming Interstate Company і Colorado Interstate Gas, які обслуговують численні газопромислові райони цих штатів, та рядом газопроводів на схід (Rockies Express), південний захід (Kern River) та захід. В останньому випадку транспортування блакитного палива забезпечує газопровід Ruby pipeline, введений в експлуатацію у 2011 році. Він проходить через північні частини штатів Юта і Невада до Малін в Орегоні, куди зокрема під'єднана одна з потужних каліфорнійських мереж California Gas Transmission Company (раніше Pacific Gas & Electric Company). Ruby pipeline має довжину 680 миль, виконаний із труб діаметром 1050 мм, а його пропускна здатність становить до 15 млрд м3 на рік. В 2014 році 50 % участі в газопроводі придбала канадська компанія Veresen, що намагається просунути проект заводу із зрідження природного газу Джордан Коув на узбережжі Орегону. Це повинне забезпечити подачу необхідного ресурсу від хабу Малін до майбутнього експортного терміналу через проектний газопровід Pacific Connector Gas Pipeline. (uk)
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 28489729 (xsd:integer)
dbo:wikiPageLength
  • 3082 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1112587058 (xsd:integer)
dbo:wikiPageWikiLink
dbp:caption
  • Ruby Pipeline (en)
dbp:country
dbp:diameterIn
  • 42 (xsd:integer)
dbp:direction
  • east-west (en)
dbp:discharge
  • 1500000000 (xsd:integer)
dbp:est
  • 2010 (xsd:integer)
dbp:finish
dbp:lengthMi
  • 680 (xsd:integer)
dbp:mapCaption
  • Location of Ruby Pipeline (en)
dbp:name
  • Ruby Pipeline (en)
dbp:operator
  • Ruby Pipeline, L.L.C. (en)
dbp:partners
dbp:photo
  • Ruby_Pipeline_Natural_Gas_Pipeline.jpeg (en)
dbp:start
dbp:through
dbp:type
  • natural gas (en)
dbp:wikiPageUsesTemplate
dcterms:subject
schema:sameAs
rdf:type
rdfs:comment
  • The Ruby Pipeline is a 42-inch (1,100 mm) natural gas pipeline running from Opal, Wyoming, to Malin, Oregon. The route crosses Northern Utah, and Northern Nevada. Ruby Pipeline, L.L.C. filed an application with the Federal Energy Regulatory Commission (FERC) on January 27, 2009, authorizing the construction and operation of the Ruby Pipeline Project. On April 5, 2010, the FERC approved the application. Construction began on July 31, 2010, and the pipeline was placed in service on July 28, 2011. The pipe is 680 miles (1,090 km) long with an expected capacity of 1.5 billion cubic feet per day (42×106 m3/d). (en)
  • Ruby pipeline — газопровід напрямку схід — захід, що зв'язує газові хаби Опал (штат Вайомінг) та Малін (штат Орегон). На початку 2010-х басейни Скелястих гір давали п'яту частину видобутку природного газу в США. Розташований у басейні Грейт Грін Рівер хаб Опал забезпечує з'єднання між трубопровідними мережами Wyoming Interstate Company і Colorado Interstate Gas, які обслуговують численні газопромислові райони цих штатів, та рядом газопроводів на схід (Rockies Express), південний захід (Kern River) та захід. В останньому випадку транспортування блакитного палива забезпечує газопровід Ruby pipeline, введений в експлуатацію у 2011 році. Він проходить через північні частини штатів Юта і Невада до Малін в Орегоні, куди зокрема під'єднана одна з потужних каліфорнійських мереж California Gas Tran (uk)
rdfs:label
  • Ruby Pipeline (en)
  • Ruby pipeline (uk)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License