The North–South Corridor (NSC), originally conceptualised as the North-South Expressway, is an under-construction expressway that will be the 11th of Singapore's network of expressways when completed. The North South Corridor will serve increasing traffic along the north-south corridor that is currently served by the Central Expressway (CTE). The 21 kilometres (13 mi) expressway will cost about S$7–8 billion when fully completed in 2026 as North-South Corridor and will connect the East Coast Parkway (ECP) with the northern parts of Singapore.

Property Value
dbo:Infrastructure/length
  • 21.5
dbo:abstract
  • Der North-South Corridor(Abkürzung: NSC) ist das jüngste Schnellstraßen-Projekt von Singapur. Für die Fertigstellung des Projektes wird das Jahr 2026 angegeben. Der North-South Corridor wurde am 19. Januar 2011 angekündigt und erstreckt sich zwischen der Admiralty Road West und Toa Payoh Rise. Am 15. November 2011 enthüllte das LTA die vollständige Ausrichtung. Die Bauarbeiten werden 2017 beginnen und im Jahr 2023 abgeschlossen sein. Der Nord-Süd-Korridor wird insgesamt 16 Eingänge und 17 Ausgänge haben, um Städte in Woodlands, Ang Mo Kio, Bishan, Toa Payoh, in Richtung Stadtzentrum zu verbinden und den Seletar Expressway zu verbinden. Central Expressway und der East Coast Parkway. Als die LTA zunächst als eine Fahrzeugautobahn konzipiert wurde, die 2020 fertiggestellt werden soll, überarbeitete sie den Korridor mit Busspuren und Fahrradrouten auf der gesamten Schnellstraße. Es wurde am 21. Januar 2016 in den North-South Corridor umgebaut. Für den Bau des Projekts muss etwas Land erworben werden. Dazu gehören das ab August 2017 abgerissene Rochor Centre, das Ellison Building und die Unterführungen an der . (de)
  • The North–South Corridor (NSC), originally conceptualised as the North-South Expressway, is an under-construction expressway that will be the 11th of Singapore's network of expressways when completed. The North South Corridor will serve increasing traffic along the north-south corridor that is currently served by the Central Expressway (CTE). The 21 kilometres (13 mi) expressway will cost about S$7–8 billion when fully completed in 2026 as North-South Corridor and will connect the East Coast Parkway (ECP) with the northern parts of Singapore. The NSC will have a total of 16 entrances and 17 exits to connect towns along the north-south corridor—Woodlands, Sembawang, Yishun, Ang Mo Kio, Bishan and Toa Payoh—with the city centre. The NSC will also provide links to existing expressways, including the Seletar Expressway (SLE), Pan-Island Expressway (PIE) and East Coast Parkway (ECP). According to the Land Transport Authority, the continuous bus lanes along the NSC will be able to reduce bus travelling times from Woodlands, Sembawang, Yishun and Ang Mo Kio to the city by up to 30 minutes through morning and evening peak express bus services, and also make bus connections between residential towns along the NSC faster by allowing intra-town buses to leverage the ramps and bus lanes on the surface, A cycling path along the entire stretch of the highway will link up the Park Connector Networks and dedicated cycling path networks within HDB towns along the entire corridor to the city centre. The North-South Corridor was initially targeted to be ready by 2023. However, due to significant delays in construction, the deadline has been pushed back to 2026. (en)
  • 南北交通廊道(英語:North–South Corridor,馬來語:Koridor Utara-Selatan,坦米爾語:வடக்கு-தெற்கு போக்குவரத்து நெடும்பாதை),前称南北高速公路,簡稱NSC,是新加坡一條正在興建的高速公路,預計2026年完成。南北交通廊道斥资700至800亿新元,兴建后将解决目前中央高速公路车流量太大的情况。高速公路全长约21公里,连接东海岸公园大道和新加坡北部各市镇。 建造新高速公路的計劃於2008年1月30日公佈,為陆路交通管理局對轄下道路網絡交通流量作出評估後的建議,公路開通後全長21公里(13英里),將新加坡北部地區與东海岸公园大道連接起來。 (zh)
dbo:length
  • 21500.000000 (xsd:double)
dbo:map
dbo:routeEnd
dbo:routeEndDirection
  • South
dbo:routeJunction
dbo:routeNumber
  • NSE
dbo:routeStartDirection
  • North
dbo:routeTypeAbbreviation
  • E
dbo:thumbnail
dbo:wikiPageID
  • 15497450 (xsd:integer)
dbo:wikiPageLength
  • 11580 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1124842259 (xsd:integer)
dbo:wikiPageWikiLink
dbp:country
  • SGP (en)
dbp:directionA
  • North (en)
dbp:directionB
  • South (en)
dbp:history
  • Construction began in 2018, completion in 2026 (en)
dbp:junction
dbp:lengthKm
  • 21.500000 (xsd:double)
dbp:mapNotes
  • North–South Expressway is labelled in single violet line (en)
dbp:name
  • North–South Corridor (en)
dbp:route
  • NSE (en)
dbp:terminusA
  • Admiralty Road West (en)
dbp:terminusB
  • ECP, Republic Avenue and Nicoll Highway (en)
dbp:type
  • E (en)
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • 南北交通廊道(英語:North–South Corridor,馬來語:Koridor Utara-Selatan,坦米爾語:வடக்கு-தெற்கு போக்குவரத்து நெடும்பாதை),前称南北高速公路,簡稱NSC,是新加坡一條正在興建的高速公路,預計2026年完成。南北交通廊道斥资700至800亿新元,兴建后将解决目前中央高速公路车流量太大的情况。高速公路全长约21公里,连接东海岸公园大道和新加坡北部各市镇。 建造新高速公路的計劃於2008年1月30日公佈,為陆路交通管理局對轄下道路網絡交通流量作出評估後的建議,公路開通後全長21公里(13英里),將新加坡北部地區與东海岸公园大道連接起來。 (zh)
  • Der North-South Corridor(Abkürzung: NSC) ist das jüngste Schnellstraßen-Projekt von Singapur. Für die Fertigstellung des Projektes wird das Jahr 2026 angegeben. Der North-South Corridor wurde am 19. Januar 2011 angekündigt und erstreckt sich zwischen der Admiralty Road West und Toa Payoh Rise. Am 15. November 2011 enthüllte das LTA die vollständige Ausrichtung. Die Bauarbeiten werden 2017 beginnen und im Jahr 2023 abgeschlossen sein. Der Nord-Süd-Korridor wird insgesamt 16 Eingänge und 17 Ausgänge haben, um Städte in Woodlands, Ang Mo Kio, Bishan, Toa Payoh, in Richtung Stadtzentrum zu verbinden und den Seletar Expressway zu verbinden. Central Expressway und der East Coast Parkway. (de)
  • The North–South Corridor (NSC), originally conceptualised as the North-South Expressway, is an under-construction expressway that will be the 11th of Singapore's network of expressways when completed. The North South Corridor will serve increasing traffic along the north-south corridor that is currently served by the Central Expressway (CTE). The 21 kilometres (13 mi) expressway will cost about S$7–8 billion when fully completed in 2026 as North-South Corridor and will connect the East Coast Parkway (ECP) with the northern parts of Singapore. (en)
rdfs:label
  • North-South Expressway (Singapur) (de)
  • North–South Corridor, Singapore (en)
  • 南北高速公路 (新加坡) (zh)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • North–South Corridor (en)
is dbo:routeJunction of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is dbp:junction of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License