dbo:abstract
|
- New Airport is a metro station on the Orange (North-South) line of the Nagpur Metro serving the Kachore Patil Nagar area of Nagpur. It was opened to the public on 8 March 2019. The station is linked to Wardha Road through a short road. The Nagpur Metro Rail Corporation Limited (now the Maharashtra Metro Rail Corporation Limited) awarded the contract to construct the station to Infrastructure Leasing & Financial Services (ILFS) in July 2016. Construction of the outer structure of the station was completed by November 2017, and interior work began in the same month. The station was awarded a platinum rating by the Indian Green Building Council, the highest rating the Council presents for sustainable construction practices that reduce environmental impact. Construction of the station was completed by January 2019. (en)
|
dbo:thumbnail
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 8474 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbp:address
|
- Kachore Patil Nagar, Nagpur (en)
|
dbp:architecturalStyle
| |
dbp:disabled
| |
dbp:levels
| |
dbp:name
| |
dbp:opened
| |
dbp:owned
| |
dbp:platforms
|
- Side platform
Platform-1 → Kasturchand Park
Platform-2 → Khapri (en)
|
dbp:structure
| |
dbp:style
| |
dbp:tracks
| |
dbp:type
|
- Nagpur Metro station (en)
|
dbp:wikiPageUsesTemplate
| |
dcterms:subject
| |
rdf:type
| |
rdfs:comment
|
- New Airport is a metro station on the Orange (North-South) line of the Nagpur Metro serving the Kachore Patil Nagar area of Nagpur. It was opened to the public on 8 March 2019. The station is linked to Wardha Road through a short road. (en)
|
rdfs:label
|
- New Airport metro station (en)
|
owl:differentFrom
| |
owl:sameAs
| |
prov:wasDerivedFrom
| |
foaf:depiction
| |
foaf:isPrimaryTopicOf
| |
is dbo:wikiPageWikiLink
of | |
is owl:differentFrom
of | |
is foaf:primaryTopic
of | |