About: Narude Dam

An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Narude Dam is a gravity dam on the Shō River about 22 km (14 mi) south of Nanto on the border of Toyama and Gifu Prefectures, Japan. It was constructed between 1950 and 1952. The dam has an associated 97 MW hydroelectric power station which was built in two parts. The first part of the power station (37 MW) was commissioned in 1951 and the second part of the power station (60 MW) was commissioned in 1975. Of the nine dams on the Shō River it is the sixth furthest downstream.

Property Value
dbo:Infrastructure/length
  • 0.19
dbo:abstract
  • The Narude Dam is a gravity dam on the Shō River about 22 km (14 mi) south of Nanto on the border of Toyama and Gifu Prefectures, Japan. It was constructed between 1950 and 1952. The dam has an associated 97 MW hydroelectric power station which was built in two parts. The first part of the power station (37 MW) was commissioned in 1951 and the second part of the power station (60 MW) was commissioned in 1975. Of the nine dams on the Shō River it is the sixth furthest downstream. (en)
  • 成出ダム(なるでダム)は、岐阜県大野郡白川村と富山県南砺市との境、一級河川・庄川水系庄川に建設されたダム。高さ53.2メートルの重力式コンクリートダムで、関西電力の発電用ダムである。同社の水力発電所・成出発電所・新成出発電所に送水し、合計最大9万3,200キロワットの電力を発生する。 (ja)
dbo:buildingStartDate
  • 1950
dbo:buildingStartYear
  • 1950-01-01 (xsd:gYear)
dbo:country
dbo:description
  • Gravity (en)
dbo:height
  • 53.200000 (xsd:double)
dbo:lake
dbo:length
  • 190.000000 (xsd:double)
dbo:location
dbo:openingYear
  • 1952-01-01 (xsd:gYear)
dbo:owner
dbo:part
dbo:purpose
  • Power
dbo:river
dbo:status
  • O
dbo:thumbnail
dbo:volume
  • 103000.000000 (xsd:double)
dbo:wikiPageID
  • 40004358 (xsd:integer)
dbo:wikiPageLength
  • 3388 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 771616094 (xsd:integer)
dbo:wikiPageWikiLink
dbp:constructionBegan
  • 1950 (xsd:integer)
dbp:country
  • Japan (en)
dbp:damCrosses
dbp:damType
  • Gravity (en)
dbp:imageCaption
  • Downstream face (en)
dbp:location
dbp:locationMap
  • Japan (en)
dbp:name
  • Narude Dam (en)
dbp:opening
  • 1952 (xsd:integer)
dbp:owner
dbp:plantCapacity
  • 97.0
dbp:plantCommission
  • 0001-03-20 (xsd:gMonthDay)
  • 0001-11-27 (xsd:gMonthDay)
dbp:plantHydraulicHead
  • New: (en)
  • Original: (en)
dbp:plantOperator
  • Kansai Electric Power Co., Inc. (en)
dbp:plantTurbines
  • New: 1 x 60 MW Francis-type (en)
  • Original: 2 x 18.5 MW Francis-type (en)
dbp:purpose
  • Power (en)
dbp:spillwayType
  • Crest overflow, 8 tainter gates (en)
dbp:status
  • O (en)
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • 36.35008611111111 136.8749222222222
rdf:type
rdfs:comment
  • The Narude Dam is a gravity dam on the Shō River about 22 km (14 mi) south of Nanto on the border of Toyama and Gifu Prefectures, Japan. It was constructed between 1950 and 1952. The dam has an associated 97 MW hydroelectric power station which was built in two parts. The first part of the power station (37 MW) was commissioned in 1951 and the second part of the power station (60 MW) was commissioned in 1975. Of the nine dams on the Shō River it is the sixth furthest downstream. (en)
  • 成出ダム(なるでダム)は、岐阜県大野郡白川村と富山県南砺市との境、一級河川・庄川水系庄川に建設されたダム。高さ53.2メートルの重力式コンクリートダムで、関西電力の発電用ダムである。同社の水力発電所・成出発電所・新成出発電所に送水し、合計最大9万3,200キロワットの電力を発生する。 (ja)
rdfs:label
  • 成出ダム (ja)
  • Narude Dam (en)
owl:sameAs
geo:geometry
  • POINT(136.87492370605 36.350086212158)
geo:lat
  • 36.350086 (xsd:float)
geo:long
  • 136.874924 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Narude Dam (en)
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License