The Na Hang Dam (also known as Tuyên Quang Dam) is a hydroelectric dam on the Gâm River near Pác Tạ Mountain in Tuyên Quang Province, Vietnam. Construction began on December 22, 2002, and the first unit was commissioned in March 2008 followed by the two other units by end of 2008. The power plant has a capacity of 342 MW (the second largest in the north), and has an energy generating potential of 1,200 GWh per year. The project's estimated approved cost was US$490 million. The project, as built, has a 92 metres (302 ft) rock fill dam and 718 metres (2,356 ft) long (crest length), called the Na Hang Dam. It has a gross storage capacity of 2.3 billion cubic metres (1,900,000 acre⋅ft) (including 1 billion cubic metres (810,000 acre⋅ft) of flood storage) on the Gâm River.
Property | Value |
---|---|
dbo:Infrastructure/length |
|
dbo:abstract |
|
dbo:buildingStartDate |
|
dbo:buildingStartYear |
|
dbo:country | |
dbo:description |
|
dbo:height |
|
dbo:lake | |
dbo:length |
|
dbo:location | |
dbo:openingYear |
|
dbo:part | |
dbo:river | |
dbo:status |
|
dbo:thumbnail | |
dbo:wikiPageExternalLink | |
dbo:wikiPageID |
|
dbo:wikiPageLength |
|
dbo:wikiPageRevisionID |
|
dbo:wikiPageWikiLink |
|
dbp:constructionBegan |
|
dbp:country | |
dbp:damCrosses | |
dbp:damType |
|
dbp:imageCaption |
|
dbp:location | |
dbp:locationMap |
|
dbp:name |
|
dbp:nameOfficial |
|
dbp:opening |
|
dbp:plantAnnualGen |
|
dbp:plantCapacity |
|
dbp:plantTurbines |
|
dbp:status |
|
dbp:wikiPageUsesTemplate | |
dcterms:subject | |
gold:hypernym | |
georss:point |
|
rdf:type |
|
rdfs:comment |
|
rdfs:label |
|
owl:sameAs | |
geo:geometry |
|
geo:lat |
|
geo:long |
|
prov:wasDerivedFrom | |
foaf:depiction | |
foaf:isPrimaryTopicOf | |
foaf:name |
|
is dbo:wikiPageWikiLink of | |
is foaf:primaryTopic of |