The Massachusetts Military Reservation Wind Project is located in Barnstable County, Massachusetts on the Massachusetts Military Reservation (MMR), also known as the Joint Base Cape Cod. This Wind Project currently consists of one wind turbine, built in 2009, and two others recently completed in 2011. The first turbine was a wind turbine with an 80-meter (260 ft) tower and a 77-meter (253 ft) rotor diameter. The two completed in 2011 were General Electric wind turbines. Each of these GE 1.5-77 wind turbines outputs 1.5 MW of power on top of an 80-meter (260 ft) tall tower. Therefore, the total net capacity for the MMR Wind project is approximately 4.5 MW. Clearance may soon become available to build more turbines. (See the “New Turbines” section below for more information). The contractin

Property Value
dbo:abstract
  • The Massachusetts Military Reservation Wind Project is located in Barnstable County, Massachusetts on the Massachusetts Military Reservation (MMR), also known as the Joint Base Cape Cod. This Wind Project currently consists of one wind turbine, built in 2009, and two others recently completed in 2011. The first turbine was a wind turbine with an 80-meter (260 ft) tower and a 77-meter (253 ft) rotor diameter. The two completed in 2011 were General Electric wind turbines. Each of these GE 1.5-77 wind turbines outputs 1.5 MW of power on top of an 80-meter (260 ft) tall tower. Therefore, the total net capacity for the MMR Wind project is approximately 4.5 MW. Clearance may soon become available to build more turbines. (See the “New Turbines” section below for more information). The contracting company hired to build all three of the turbines is called , and the plant code and utility ID of the facility are 57253 and 56619, respectively. (en)
dbo:installedCapacity
  • 4500000.000000 (xsd:double)
dbo:location
dbo:openingYear
  • 2009-01-01 (xsd:gYear)
dbo:owner
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 45041893 (xsd:integer)
dbo:wikiPageLength
  • 8420 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1062902468 (xsd:integer)
dbo:wikiPageWikiLink
dbp:imageCaption
  • Close Up Picture of One of the Wind Turbines for the MMR Wind Project (en)
dbp:location
dbp:name
  • Massachusetts Military Reservation Wind Project (en)
dbp:owner
dbp:psElectricalCapacity
  • 4.5
dbp:psUnitsOperational
  • 3 (xsd:integer)
dbp:wikiPageUsesTemplate
dcterms:subject
georss:point
  • 41.7 -70.3
rdf:type
rdfs:comment
  • The Massachusetts Military Reservation Wind Project is located in Barnstable County, Massachusetts on the Massachusetts Military Reservation (MMR), also known as the Joint Base Cape Cod. This Wind Project currently consists of one wind turbine, built in 2009, and two others recently completed in 2011. The first turbine was a wind turbine with an 80-meter (260 ft) tower and a 77-meter (253 ft) rotor diameter. The two completed in 2011 were General Electric wind turbines. Each of these GE 1.5-77 wind turbines outputs 1.5 MW of power on top of an 80-meter (260 ft) tall tower. Therefore, the total net capacity for the MMR Wind project is approximately 4.5 MW. Clearance may soon become available to build more turbines. (See the “New Turbines” section below for more information). The contractin (en)
rdfs:label
  • Massachusetts Military Reservation Wind Project (en)
owl:sameAs
geo:geometry
  • POINT(-70.300003051758 41.700000762939)
geo:lat
  • 41.700001 (xsd:float)
geo:long
  • -70.300003 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:homepage
foaf:isPrimaryTopicOf
foaf:name
  • Massachusetts Military Reservation Wind Project (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License