The Madison Avenue Line is a line of the Memphis Area Transit Authority trolley system. The trolley line began operating in 2004, and cost $56 million to build. Currently, it operates 2.2 mi (3.5 km) of double track along Madison Avenue with six stops stretching into Midtown Memphis. The line was built to connect the Main Street system to the Medical District just east of Downtown Memphis. Trolley service has been suspended since April 2014, after two trolley cars caught fire within a span of six months. Buses have been serving the line since then, but MATA plans to restore trolley operation to the line eventually.
Property | Value |
---|---|
dbo:abstract |
|
dbo:isPartOf | |
dbo:lineLength |
|
dbo:location | |
dbo:numberOfStations |
|
dbo:operator | |
dbo:routeStart | |
dbo:status |
|
dbo:thumbnail | |
dbo:trackLength |
|
dbo:type | |
dbo:wikiPageID |
|
dbo:wikiPageLength |
|
dbo:wikiPageRevisionID |
|
dbo:wikiPageWikiLink |
|
dbp:caption |
|
dbp:electrification | |
dbp:end |
|
dbp:imageWidth |
|
dbp:locale |
|
dbp:name |
|
dbp:operator | |
dbp:start |
|
dbp:stations |
|
dbp:status |
|
dbp:system | |
dbp:tracks |
|
dbp:type | |
dbp:wikiPageUsesTemplate | |
dcterms:subject | |
gold:hypernym | |
rdf:type |
|
rdfs:comment |
|
rdfs:label |
|
owl:sameAs | |
prov:wasDerivedFrom | |
foaf:depiction | |
foaf:isPrimaryTopicOf | |
foaf:name |
|
is dbo:wikiPageWikiLink of | |
is foaf:primaryTopic of |