The M2 line, also referred as Üçyol–Çamlıkule Line (Turkish: Üçyol–Çamlıkule Hattı) is a planned ATO rapid transit line in İzmir, Turkey. The line has a total length of 11.3 km (7.0 mi) and would begin at Üçyol and run southeast into Buca. When completed, the line will become the third driverless metro line in Turkey, after the M5 and M7 lines in Istanbul. Construction started in February 14, 2022 and the line is expected to enter service in 2026.It will cost $765 million, and the yearly expected profit from operation is $45 million.
Property | Value |
---|---|
dbo:abstract |
|
dbo:isPartOf | |
dbo:lineLength |
|
dbo:location | |
dbo:numberOfStations |
|
dbo:openingYear |
|
dbo:operator | |
dbo:owner | |
dbo:routeEnd | |
dbo:routeStart | |
dbo:speedLimit |
|
dbo:status |
|
dbo:thumbnail | |
dbo:type | |
dbo:wikiPageID |
|
dbo:wikiPageLength |
|
dbo:wikiPageRevisionID |
|
dbo:wikiPageWikiLink |
|
dbp:caption |
|
dbp:color |
|
dbp:dailyRidership |
|
dbp:electrification |
|
dbp:end | |
dbp:imageAlt |
|
dbp:linelengthKm |
|
dbp:linenumber |
|
dbp:locale | |
dbp:mapName |
|
dbp:mapState |
|
dbp:name |
|
dbp:nativeName |
|
dbp:nativeNameLang |
|
dbp:open |
|
dbp:operator | |
dbp:owner | |
dbp:routes |
|
dbp:signalling |
|
dbp:speedKm/h |
|
dbp:start | |
dbp:stations |
|
dbp:status |
|
dbp:system | |
dbp:tracks |
|
dbp:type | |
dbp:wikiPageUsesTemplate | |
dcterms:subject | |
rdf:type | |
rdfs:comment |
|
rdfs:label |
|
owl:sameAs | |
prov:wasDerivedFrom | |
foaf:depiction | |
foaf:isPrimaryTopicOf | |
foaf:name |
|
is dbo:wikiPageRedirects of | |
is dbo:wikiPageWikiLink of | |
is foaf:primaryTopic of |