The M2 line, also referred as Üçyol–Çamlıkule Line (Turkish: Üçyol–Çamlıkule Hattı) is a planned ATO rapid transit line in İzmir, Turkey. The line has a total length of 11.3 km (7.0 mi) and would begin at Üçyol and run southeast into Buca. When completed, the line will become the third driverless metro line in Turkey, after the M5 and M7 lines in Istanbul. Construction started in February 14, 2022 and the line is expected to enter service in 2026.It will cost $765 million, and the yearly expected profit from operation is $45 million.

Property Value
dbo:abstract
  • The M2 line, also referred as Üçyol–Çamlıkule Line (Turkish: Üçyol–Çamlıkule Hattı) is a planned ATO rapid transit line in İzmir, Turkey. The line has a total length of 11.3 km (7.0 mi) and would begin at Üçyol and run southeast into Buca. When completed, the line will become the third driverless metro line in Turkey, after the M5 and M7 lines in Istanbul. Construction started in February 14, 2022 and the line is expected to enter service in 2026.It will cost $765 million, and the yearly expected profit from operation is $45 million. (en)
dbo:isPartOf
dbo:lineLength
  • 11300.000000 (xsd:double)
dbo:location
dbo:numberOfStations
  • 11 (xsd:nonNegativeInteger)
dbo:openingYear
  • 2026-01-01 (xsd:gYear)
dbo:operator
dbo:owner
dbo:routeEnd
dbo:routeStart
dbo:speedLimit
  • 100.000000 (xsd:double)
dbo:status
  • Under Construction
dbo:thumbnail
dbo:type
dbo:wikiPageID
  • 63528237 (xsd:integer)
dbo:wikiPageLength
  • 11424 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1099023505 (xsd:integer)
dbo:wikiPageWikiLink
dbp:caption
  • The western terminus of the line, Üçyol. (en)
dbp:color
  • 0 (xsd:integer)
dbp:dailyRidership
  • 400000 (xsd:integer)
dbp:electrification
  • 750 (xsd:integer)
dbp:end
dbp:imageAlt
  • Platforms on both sides with a double track rail line going in the middle. Station signs reading Üçyol, the station name, and the exits, are visible. (en)
dbp:linelengthKm
  • 11.300000 (xsd:double)
dbp:linenumber
  • 2 (xsd:integer)
dbp:locale
dbp:mapName
  • map_name (en)
dbp:mapState
  • uncollapsed (en)
dbp:name
  • Üçyol–Çamlıkule Line (en)
dbp:nativeName
  • Üçyol–Çamlıkule Hattı (en)
dbp:nativeNameLang
  • Turkish (en)
dbp:open
  • 2026 (xsd:integer)
dbp:operator
dbp:owner
dbp:routes
  • Tınaztepe-Eşrefpaşa-Üçyol-Tınaztepe (en)
  • Çamlıkule-Üçyol-Eşrefpaşa-Çamlıkule (en)
dbp:signalling
  • Unattended operation with CBTC (en)
dbp:speedKm/h
  • 100 (xsd:integer)
dbp:start
dbp:stations
  • 11 (xsd:integer)
dbp:status
  • Under Construction (en)
dbp:system
dbp:tracks
  • 2 (xsd:integer)
dbp:type
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • The M2 line, also referred as Üçyol–Çamlıkule Line (Turkish: Üçyol–Çamlıkule Hattı) is a planned ATO rapid transit line in İzmir, Turkey. The line has a total length of 11.3 km (7.0 mi) and would begin at Üçyol and run southeast into Buca. When completed, the line will become the third driverless metro line in Turkey, after the M5 and M7 lines in Istanbul. Construction started in February 14, 2022 and the line is expected to enter service in 2026.It will cost $765 million, and the yearly expected profit from operation is $45 million. (en)
rdfs:label
  • M2 (İzmir Metro) (en)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Üçyol–Çamlıkule Line (en)
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License