An Entity of Type: Rapid transit, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Line 4 of the Changchun Rail Transit (Chinese: 长春轨道交通4号线; pinyin: Chángchūn Guǐdào Jiāotōng Sì Hào Xiàn) is a light metro line running from north to south Changchun. It was opened on 30 June 2011. It is currently 16.33 km long with 15 stations. Although it uses extended low floor LRVs, the line operates more like a metro, being entirely separate from traffic. This is similar to U6 of the Vienna U-Bahn.

Property Value
dbo:abstract
  • Line 4 of the Changchun Rail Transit (Chinese: 长春轨道交通4号线; pinyin: Chángchūn Guǐdào Jiāotōng Sì Hào Xiàn) is a light metro line running from north to south Changchun. It was opened on 30 June 2011. It is currently 16.33 km long with 15 stations. Although it uses extended low floor LRVs, the line operates more like a metro, being entirely separate from traffic. This is similar to U6 of the Vienna U-Bahn. (en)
  • 長春軌道交通4号線(ちょうしゅんきどうこうつう4ごうせん、中文表記: 长春轨道交通4号线、英文表記: Changchun Rail Transit Line 4)は、中華人民共和国吉林省長春市寛城区の長春駅北駅から南関区のまでを結ぶ長春軌道交通のライトレール路線である。 (ja)
  • 长春轨道交通4号线是吉林省长春市第二条轻轨线路,于2011年5月6日开始运营。线路从宽城区长春站北站到南关区天工路站共长16.3公里,共16个车站(其中东新路站尚未开通)。班次为5分钟一辆。在伪满皇宫站和职业学院站可与长春轨道交通3号线进行换乘,在长春站北可与长春轨道交通1号线进行换乘,在吉林大路站可与长春轨道交通2号线进行换乘,且路线有向南和向西北延伸的规划。由于初期没有启用ATO系统、建设尚未彻底完工,无安全门。 (zh)
dbo:isPartOf
dbo:lineLength
  • 16330.000000 (xsd:double)
dbo:location
dbo:openingDate
  • 2011-06-30 (xsd:date)
dbo:openingYear
  • 2011-01-01 (xsd:gYear)
dbo:operator
dbo:status
  • Operational
dbo:thumbnail
dbo:type
dbo:wikiPageID
  • 37209477 (xsd:integer)
dbo:wikiPageLength
  • 6120 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1092906856 (xsd:integer)
dbo:wikiPageWikiLink
dbp:character
  • elevated and underground (en)
dbp:imageWidth
  • 265 (xsd:integer)
dbp:locale
dbp:logo
  • CRRT_line4_logo.svg (en)
dbp:logoWidth
  • 100 (xsd:integer)
dbp:mapState
  • collapsed (en)
dbp:open
  • 2011-06-30 (xsd:date)
dbp:operator
dbp:owner
dbp:p
  • Chángchūn Guǐdào Jiāotōng Sì Hào Xiàn (en)
dbp:routes
  • 1 (xsd:integer)
dbp:s
  • 长春轨道交通4号线 (en)
dbp:status
  • Operational (en)
dbp:system
dbp:tracks
  • 2 (xsd:integer)
dbp:type
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • Line 4 of the Changchun Rail Transit (Chinese: 长春轨道交通4号线; pinyin: Chángchūn Guǐdào Jiāotōng Sì Hào Xiàn) is a light metro line running from north to south Changchun. It was opened on 30 June 2011. It is currently 16.33 km long with 15 stations. Although it uses extended low floor LRVs, the line operates more like a metro, being entirely separate from traffic. This is similar to U6 of the Vienna U-Bahn. (en)
  • 長春軌道交通4号線(ちょうしゅんきどうこうつう4ごうせん、中文表記: 长春轨道交通4号线、英文表記: Changchun Rail Transit Line 4)は、中華人民共和国吉林省長春市寛城区の長春駅北駅から南関区のまでを結ぶ長春軌道交通のライトレール路線である。 (ja)
  • 长春轨道交通4号线是吉林省长春市第二条轻轨线路,于2011年5月6日开始运营。线路从宽城区长春站北站到南关区天工路站共长16.3公里,共16个车站(其中东新路站尚未开通)。班次为5分钟一辆。在伪满皇宫站和职业学院站可与长春轨道交通3号线进行换乘,在长春站北可与长春轨道交通1号线进行换乘,在吉林大路站可与长春轨道交通2号线进行换乘,且路线有向南和向西北延伸的规划。由于初期没有启用ATO系统、建设尚未彻底完工,无安全门。 (zh)
rdfs:label
  • Line 4 (Changchun Rail Transit) (en)
  • 長春軌道交通4号線 (ja)
  • 长春轨道交通4号线 (zh)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License