An Entity of Type: Rapid transit, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Line 3 of the Dalian Metro (R3; Chinese: 大连地铁3号线; pinyin: Dàlián Dìtiě Sān Hào Xiàn) is a rapid transit line running from southwest to northwest Dalian. It was opened on the 8 November 2002. This line is 63.45 km (39.43 mi) long with 12 stations. Line 3 is almost completely at grade or above ground; 13.89 kilometres (8.63 mi) is elevated, 1.123 kilometres (0.698 mi) is underground and 31.39 kilometres (19.50 mi) is at grade. Six stations are elevated, and the remainder are at grade. Transfers to trams and trains are possible at the Dalian Railway Station.

Property Value
dbo:abstract
  • Line 3 of the Dalian Metro (R3; Chinese: 大连地铁3号线; pinyin: Dàlián Dìtiě Sān Hào Xiàn) is a rapid transit line running from southwest to northwest Dalian. It was opened on the 8 November 2002. This line is 63.45 km (39.43 mi) long with 12 stations. Line 3 is almost completely at grade or above ground; 13.89 kilometres (8.63 mi) is elevated, 1.123 kilometres (0.698 mi) is underground and 31.39 kilometres (19.50 mi) is at grade. Six stations are elevated, and the remainder are at grade. Transfers to trams and trains are possible at the Dalian Railway Station. The northern area of the city, where the Economic and Technology Development Zone is located, is not well-served by buses. The metro line beginning at the downtown commercial center (near the Dalian railway station) runs through five administrative districts of the city and serves as an express transport between the northern (developing) region and the downtown area. The line extends northward to Golden Pebble Beach (Jinshitan Scenic Area), a national scenic park 50 km (31 mi) from the city center. The Jiuli branch route was opened on 28 December 2008. The branch route connects central Dalian with Jinzhou District (金州区) with fourteen stations from south to north. The branch begins at Dalian Development Area station and stretches northwest ending at Jiuli station. All stations have side platforms. Tracks in the platform area have no ballast (gravel); however, tracks outside the station are on ballast. All stations are covered by a combination of transparent corrugated sheets and a concrete roof. In October 2017, most station names were re-translated from Pinyin into conventional English. Since 18 November 2021, operation schedule of the branch section has changed to only Dalian Development Area - Jiuli, branch trains no longer run through Dalian Railway station, to allow testing of trains of line 13, and through trains between line 3 branch and line 13. (en)
  • 大連地下鉄3号線(だいれんちかてつ3ごうせん)は中華人民共和国遼寧省大連市を走行する大連地下鉄の鉄道路線である。ラインカラーは■桃色。 (ja)
  • 大连地铁3号线是大连地铁的一条线路,全长49.15公里,共有20座车站(含一员工专用车站),其中主线地面站4座,高架站8座,预留地面站2座,平均站距5.18公里。线路于2003年5月1日开通运营,是大连市以及辽宁省的第一条地铁线路。 本线路主线起点位于大连火车站,终点位于金石滩;支线起点位于开发区站,终点设于九里站。列车在大多数情况下开行主线“大连火车站-金石滩”及支线“开发区-普兰店振兴街”两种交路(九里至普兰店振兴街区间为13号线,目前与3号线支线贯通运营),乘客需在开发区站完成主线与支线之间的换乘。 2021年11月18日前,每日早晚高峰时段各开行一班“大连火车站-九里”的主线支线直通列车,在驶过开发区站后直接开往支线的九里站方向,该运行交路随着地铁13号线与3号线支线的贯通运营而暂时取消。 (zh)
dbo:isPartOf
dbo:lineLength
  • 63450.000000 (xsd:double)
dbo:location
dbo:numberOfStations
  • 18 (xsd:nonNegativeInteger)
dbo:openingDate
  • 2002-11-08 (xsd:date)
dbo:openingYear
  • 2002-01-01 (xsd:gYear)
dbo:status
  • Operational
dbo:thumbnail
dbo:type
dbo:wikiPageID
  • 37202497 (xsd:integer)
dbo:wikiPageLength
  • 8440 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1111479436 (xsd:integer)
dbo:wikiPageWikiLink
dbp:caption
  • Line 3 train approaching Xianglujiao station (en)
dbp:character
  • Elevated (en)
dbp:end
  • / (en)
dbp:imageWidth
  • 265 (xsd:integer)
dbp:locale
dbp:logo
  • DLM Line 3 icon.svg (en)
dbp:logoWidth
  • 100 (xsd:integer)
dbp:mapState
  • collapsed (en)
dbp:open
  • 2002-11-08 (xsd:date)
dbp:operator
  • Dalian Metro Group Co., Ltd. (en)
dbp:otherName
  • R3 (en)
  • Dalian–Jinzhou intercity railway (en)
dbp:owner
dbp:p
  • Dàlián Dìtiě Sān Hào Xiàn (en)
dbp:routes
  • 2 (xsd:integer)
dbp:s
  • 大连地铁3号线 (en)
dbp:stations
  • 18 (xsd:integer)
dbp:status
  • Operational (en)
dbp:system
dbp:tracks
  • 2 (xsd:integer)
dbp:type
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • 大連地下鉄3号線(だいれんちかてつ3ごうせん)は中華人民共和国遼寧省大連市を走行する大連地下鉄の鉄道路線である。ラインカラーは■桃色。 (ja)
  • 大连地铁3号线是大连地铁的一条线路,全长49.15公里,共有20座车站(含一员工专用车站),其中主线地面站4座,高架站8座,预留地面站2座,平均站距5.18公里。线路于2003年5月1日开通运营,是大连市以及辽宁省的第一条地铁线路。 本线路主线起点位于大连火车站,终点位于金石滩;支线起点位于开发区站,终点设于九里站。列车在大多数情况下开行主线“大连火车站-金石滩”及支线“开发区-普兰店振兴街”两种交路(九里至普兰店振兴街区间为13号线,目前与3号线支线贯通运营),乘客需在开发区站完成主线与支线之间的换乘。 2021年11月18日前,每日早晚高峰时段各开行一班“大连火车站-九里”的主线支线直通列车,在驶过开发区站后直接开往支线的九里站方向,该运行交路随着地铁13号线与3号线支线的贯通运营而暂时取消。 (zh)
  • Line 3 of the Dalian Metro (R3; Chinese: 大连地铁3号线; pinyin: Dàlián Dìtiě Sān Hào Xiàn) is a rapid transit line running from southwest to northwest Dalian. It was opened on the 8 November 2002. This line is 63.45 km (39.43 mi) long with 12 stations. Line 3 is almost completely at grade or above ground; 13.89 kilometres (8.63 mi) is elevated, 1.123 kilometres (0.698 mi) is underground and 31.39 kilometres (19.50 mi) is at grade. Six stations are elevated, and the remainder are at grade. Transfers to trams and trains are possible at the Dalian Railway Station. (en)
rdfs:label
  • Line 3 (Dalian Metro) (en)
  • 大連地下鉄3号線 (ja)
  • 大连地铁3号线 (zh)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License