An Entity of Type: Rapid transit, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Nanchang Metro Line 1 (also known as Nanchang Rail Transit Line 1 in official documents) is the first rail transit line ever constructed in Nanchang and has opened in 2015. The Phase 1 of Line 1 runs from Shuanggang to Olympic Stadium, covered North Nanchang (Changbei, Chinese: 昌北), Old Town and East Nanchang (Changdong, Chinese: 昌东). It is planned in Phase 2 that Line 1 will be extended to Changbei Airport to the northwest and (Chinese: 麻丘) to the east.

Property Value
dbo:abstract
  • Nanchang Metro Line 1 (also known as Nanchang Rail Transit Line 1 in official documents) is the first rail transit line ever constructed in Nanchang and has opened in 2015. The Phase 1 of Line 1 runs from Shuanggang to Olympic Stadium, covered North Nanchang (Changbei, Chinese: 昌北), Old Town and East Nanchang (Changdong, Chinese: 昌东). It is planned in Phase 2 that Line 1 will be extended to Changbei Airport to the northwest and (Chinese: 麻丘) to the east. (en)
  • 南昌地下鉄1号線(なんしょうちかてつ1ごうせん、中文表記: 南昌地铁1号线、英文表記: Nanchang Subway Line 1)は、中華人民共和国江西省南昌市青山湖区のから南昌県までを結ぶ南昌地下鉄の地下鉄路線である。 (ja)
  • 南昌地铁1号线(官方文件正式名称:南昌市轨道交通1号线)是2015年在中华人民共和国江西省南昌市开建的第一条地铁线路,于2015年12月26日投入使用。1号线一期工程起于双港站,止于瑶湖西岸的瑶湖西站,全程28.7千米,24个车站;线路途径昌北、老城区及昌东,连接南昌东部及西北部;线路在赣江以东基本穿过南昌中轴线。二期工程计划向北延伸至南昌昌北机场,向东穿越瑶湖延伸至麻丘。 (zh)
dbo:isPartOf
dbo:lineLength
  • 28800.000000 (xsd:double)
dbo:location
dbo:numberOfStations
  • 24 (xsd:nonNegativeInteger)
dbo:openingDate
  • 2015-12-26 (xsd:date)
dbo:openingYear
  • 2015-01-01 (xsd:gYear)
dbo:speedLimit
  • 80.000000 (xsd:double)
dbo:status
  • Operational
dbo:thumbnail
dbo:type
dbo:wikiPageID
  • 40211554 (xsd:integer)
dbo:wikiPageLength
  • 8588 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1091708394 (xsd:integer)
dbo:wikiPageWikiLink
dbp:depot
  • Jiaoqiao Train Shed (en)
  • Yaohu MPD (en)
dbp:electrification
  • Overhead catenary,DC 1500 V (en)
dbp:linelengthKm
  • 28.800000 (xsd:double)
dbp:locale
dbp:mapState
  • collapsed (en)
dbp:nativeName
  • 南昌地铁1号线 (en)
dbp:nativeNameLang
  • zh (en)
dbp:open
  • 2015-12-26 (xsd:date)
dbp:otherName
  • Nanchang Rail Transit Line 1 (en)
dbp:speedKm/h
  • 80 (xsd:integer)
dbp:stations
  • 24 (xsd:integer)
dbp:status
  • Operational (en)
dbp:stock
  • 6 (xsd:integer)
dbp:system
dbp:type
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • Nanchang Metro Line 1 (also known as Nanchang Rail Transit Line 1 in official documents) is the first rail transit line ever constructed in Nanchang and has opened in 2015. The Phase 1 of Line 1 runs from Shuanggang to Olympic Stadium, covered North Nanchang (Changbei, Chinese: 昌北), Old Town and East Nanchang (Changdong, Chinese: 昌东). It is planned in Phase 2 that Line 1 will be extended to Changbei Airport to the northwest and (Chinese: 麻丘) to the east. (en)
  • 南昌地下鉄1号線(なんしょうちかてつ1ごうせん、中文表記: 南昌地铁1号线、英文表記: Nanchang Subway Line 1)は、中華人民共和国江西省南昌市青山湖区のから南昌県までを結ぶ南昌地下鉄の地下鉄路線である。 (ja)
  • 南昌地铁1号线(官方文件正式名称:南昌市轨道交通1号线)是2015年在中华人民共和国江西省南昌市开建的第一条地铁线路,于2015年12月26日投入使用。1号线一期工程起于双港站,止于瑶湖西岸的瑶湖西站,全程28.7千米,24个车站;线路途径昌北、老城区及昌东,连接南昌东部及西北部;线路在赣江以东基本穿过南昌中轴线。二期工程计划向北延伸至南昌昌北机场,向东穿越瑶湖延伸至麻丘。 (zh)
rdfs:label
  • Line 1 (Nanchang Metro) (en)
  • 南昌地下鉄1号線 (ja)
  • 南昌地铁1号线 (zh)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License