An Entity of Type: Abstraction100002137, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Least-cost planning methodology (LCPM), also referred to as "least-cost planning" (LCP) is a relatively new technique used by economists for making rational decisions about investments in transport and other urban infrastructure projects. Equal footing means that there is no discrimination against some alternatives based on political or ideological factors. There has been a trend in the US towards making LCPM mandatory for regional transport plans. For example, it has been required by Washington State law (RCW 47.80.030) for regional transport plans since July 1, 1994.

Property Value
dbo:abstract
  • Least-cost planning methodology (LCPM), also referred to as "least-cost planning" (LCP) is a relatively new technique used by economists for making rational decisions about investments in transport and other urban infrastructure projects. It is based on cost–benefit analysis. However, it is more comprehensive in that it looks at not only the total costs and total benefits for an individual project, but it also examines the total costs and benefits for all alternatives or combinations thereof and treats them on an "equal footing." These alternatives include not only construction projects but also demand reduction measures, such as road pricing, developing more walkable neighbourhoods and promoting remote work. Equal footing means that there is no discrimination against some alternatives based on political or ideological factors. LCPM itself is generally more costly than cost–benefit analysis, because of the requirement to study objectively all potential alternatives. However, it can provide large savings to taxpayers because it will do a better job of selecting those projects which maximise benefits while minimising costs. There has been a trend in the US towards making LCPM mandatory for regional transport plans. For example, it has been required by Washington State law (RCW 47.80.030) for regional transport plans since July 1, 1994. (en)
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 14325152 (xsd:integer)
dbo:wikiPageLength
  • 1676 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1076615144 (xsd:integer)
dbo:wikiPageWikiLink
dcterms:subject
rdf:type
rdfs:comment
  • Least-cost planning methodology (LCPM), also referred to as "least-cost planning" (LCP) is a relatively new technique used by economists for making rational decisions about investments in transport and other urban infrastructure projects. Equal footing means that there is no discrimination against some alternatives based on political or ideological factors. There has been a trend in the US towards making LCPM mandatory for regional transport plans. For example, it has been required by Washington State law (RCW 47.80.030) for regional transport plans since July 1, 1994. (en)
rdfs:label
  • Least-cost planning methodology (en)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License