An Entity of Type: Thing, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Karamay–Tacheng railway (Chinese: 克塔铁路; pinyin: Kè-Tǎ tiělù) is a branch railway in China's Xinjiang Uighur Autonomous Region. The 270 km long line starts at Baikouquan Station (百口泉站) on the Kuytun–Beitun railway in Karamay City, and runs to the northwest, passing through the northeastern part of Toli County and Emin County, and terminating in Tacheng City, near the border with Kazakhstan. The line opened on 30 May 2019. According to Chinanews, 3 daily train services will be available, and a train trip to Ürümqi will take 9–10 hours at as little as 90 RMB.

Property Value
dbo:abstract
  • The Karamay–Tacheng railway (Chinese: 克塔铁路; pinyin: Kè-Tǎ tiělù) is a branch railway in China's Xinjiang Uighur Autonomous Region. The 270 km long line starts at Baikouquan Station (百口泉站) on the Kuytun–Beitun railway in Karamay City, and runs to the northwest, passing through the northeastern part of Toli County and Emin County, and terminating in Tacheng City, near the border with Kazakhstan. The line opened on 30 May 2019. According to Chinanews, 3 daily train services will be available, and a train trip to Ürümqi will take 9–10 hours at as little as 90 RMB. (en)
  • 克塔線 (こくとうせん、中文表記: 克塔铁路) は、中国新疆ウイグル自治区のカラマイ市にある奎阿線から、イリ・カザフ自治州タルバガタイ地区のトリ県・ドルビルジン県を経由し、チョチェク市を結ぶ全長291kmの鉄道路線。単線・非電化。 チョチェク市には、カザフスタンとの国境ゲートがあり、将来的にカザフスタンの鉄道に接続する三番目の路線とする構想がある。 (ja)
  • 克塔铁路是中国新疆维吾尔自治区境内的一条铁路,南起奎北铁路克拉玛依市接轨,沿克拉玛依市、百口泉油田向北,经托里县铁厂沟镇、额敏县,到达终点塔城市。线路全长291千米,2019年5月30日建成通车。主要服务于和什托洛盖煤田原煤外运。 (zh)
dbo:wikiPageID
  • 55922985 (xsd:integer)
dbo:wikiPageLength
  • 1751 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1098108032 (xsd:integer)
dbo:wikiPageWikiLink
dbp:c
  • 克塔铁路 (en)
dbp:p
  • Kè-Tǎ tiělù (en)
dbp:wikiPageUsesTemplate
dcterms:subject
rdfs:comment
  • The Karamay–Tacheng railway (Chinese: 克塔铁路; pinyin: Kè-Tǎ tiělù) is a branch railway in China's Xinjiang Uighur Autonomous Region. The 270 km long line starts at Baikouquan Station (百口泉站) on the Kuytun–Beitun railway in Karamay City, and runs to the northwest, passing through the northeastern part of Toli County and Emin County, and terminating in Tacheng City, near the border with Kazakhstan. The line opened on 30 May 2019. According to Chinanews, 3 daily train services will be available, and a train trip to Ürümqi will take 9–10 hours at as little as 90 RMB. (en)
  • 克塔線 (こくとうせん、中文表記: 克塔铁路) は、中国新疆ウイグル自治区のカラマイ市にある奎阿線から、イリ・カザフ自治州タルバガタイ地区のトリ県・ドルビルジン県を経由し、チョチェク市を結ぶ全長291kmの鉄道路線。単線・非電化。 チョチェク市には、カザフスタンとの国境ゲートがあり、将来的にカザフスタンの鉄道に接続する三番目の路線とする構想がある。 (ja)
  • 克塔铁路是中国新疆维吾尔自治区境内的一条铁路,南起奎北铁路克拉玛依市接轨,沿克拉玛依市、百口泉油田向北,经托里县铁厂沟镇、额敏县,到达终点塔城市。线路全长291千米,2019年5月30日建成通车。主要服务于和什托洛盖煤田原煤外运。 (zh)
rdfs:label
  • Karamay–Tacheng railway (en)
  • 克塔線 (ja)
  • 克塔铁路 (zh)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License