The International Performance Measurement and Verification Protocol (IPMVP®) defines standard terms and suggests best practise for quantifying the results of energy efficiency investments and increase investment in energy and water efficiency, demand management and renewable energy projects. The IPMVP was developed by a coalition of international organizations (led by the United States Department of Energy) starting in 1994-1995. The Protocol has become the national measurement and verification standard in the United States and many other countries, and has been translated into 10 languages. IPMVP is published in three volumes, most widely downloaded and translated is IPMVP Volume 1 Concepts and Options for Determining Energy and Water Savings. A major driving force was the need for a comm

Property Value
dbo:abstract
  • The International Performance Measurement and Verification Protocol (IPMVP®) defines standard terms and suggests best practise for quantifying the results of energy efficiency investments and increase investment in energy and water efficiency, demand management and renewable energy projects. The IPMVP was developed by a coalition of international organizations (led by the United States Department of Energy) starting in 1994-1995. The Protocol has become the national measurement and verification standard in the United States and many other countries, and has been translated into 10 languages. IPMVP is published in three volumes, most widely downloaded and translated is IPMVP Volume 1 Concepts and Options for Determining Energy and Water Savings. A major driving force was the need for a common protocol to verify savings claimed by Energy Service Companies (ESCOs) implementing Energy Conservation Measures (ECM). The protocol is a framework to determine water and energy savings associated with ECMs. (en)
  • Le protocole international de mesure et de vérification de la performance énergétique (ou PIMVP), en anglais International performance measurement and verification protocol abrégé en IPMVP, définit des standards et des termes et suggère les bonnes pratiques pour les projets d'efficacité énergétique et d'économie d'eau. IPMVP est un nom déposé par la , structure de standardisation privée dont le siège se trouve aux États-Unis. (fr)
  • Il Protocollo internazionale di misura e verifica delle prestazioni, è una raccolta delle migliori pratiche oggi disponibili per verificare i risultati di progetti di efficienza energetica, efficienza idrica e fonti rinnovabili in qualsiasi campo, dagli edifici civili ai siti industriali. Questo protocollo è stato sviluppato da un insieme di organizzazioni internazionali (guidate dal dipartimento dell'energia degli Stati Uniti) a partire dal 1994. L'IPMVP ha assunto diverse forme e una prima versione denominata "North American Energy Measurement and Verification Protocol” (NEMVP) fu pubblicata nel 1995. Questa versione è stata poi aggiornata, ampliata ed internazionalizzata nel 1997 quando venne pubblicata la prima edizione dell'attuale IPMVP. Successivamente, nel Gennaio 2001 fu pubblicata una terza versione che comprendeva due volumi distinti; nello stesso anno, nel mese di settembre, fu creata la IPMVP Inc., un'organizzazione senza scopo di lucro il cui obiettivo era quello di coinvolgere la comunità internazionale nell'adozione di questo protocollo. I documenti relativi al protocollo IPMVP, infatti, sono liberamente scaricabili dal sito di EVO previa registrazione gratuita. Nel 2004 l'IPVMP Inc. cambiò il suo nome ed assunse la sua attuale forma: EVO – Efficiency Valuation Organization. L'uso di questo protocollo è molto diffuso tra le ESCO negli Stati Uniti e sta acquisendo popolarità anche in altri paesi (Cina, India, Sudafrica, Australia, Spagna, Portogallo, Francia, ecc.). Si evidenzia che il Protocollo è in continua evoluzione ed è attualmente tradotto in 16 lingue. A fine 2017 è stata pubblicata da EVO la nuova versione del volume "Concetti base" che ha introdotto alcune migliorie, ad esempio: * le definizioni sono maggiormente armonizzate con la UNI CEN ISO 50001; * è stato introdotto, oltre ai consumi evitati e i risparmi normalizzati, l'approccio di "back casting"; * nell'Opzione C, il risparmio può scendere al di sotto del 10% dei consumi evitati previa valutazione dell'incertezza. (it)
  • Міжнаро́дний протоко́л вимі́рювання та верифіка́ції — процедури, що дозволяють власникам будівель, енергосервісним компаніям і організаціям, які фінансують проекти з ефективного використання енергії, оцінити ефективність і визначати обсяг енергоощадності. Протокол прийнятий США та низкою інших держав. (uk)
dbo:wikiPageID
  • 27295071 (xsd:integer)
dbo:wikiPageLength
  • 7807 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1061754269 (xsd:integer)
dbo:wikiPageWikiLink
dbp:wikiPageUsesTemplate
dcterms:subject
rdfs:comment
  • Le protocole international de mesure et de vérification de la performance énergétique (ou PIMVP), en anglais International performance measurement and verification protocol abrégé en IPMVP, définit des standards et des termes et suggère les bonnes pratiques pour les projets d'efficacité énergétique et d'économie d'eau. IPMVP est un nom déposé par la , structure de standardisation privée dont le siège se trouve aux États-Unis. (fr)
  • Міжнаро́дний протоко́л вимі́рювання та верифіка́ції — процедури, що дозволяють власникам будівель, енергосервісним компаніям і організаціям, які фінансують проекти з ефективного використання енергії, оцінити ефективність і визначати обсяг енергоощадності. Протокол прийнятий США та низкою інших держав. (uk)
  • The International Performance Measurement and Verification Protocol (IPMVP®) defines standard terms and suggests best practise for quantifying the results of energy efficiency investments and increase investment in energy and water efficiency, demand management and renewable energy projects. The IPMVP was developed by a coalition of international organizations (led by the United States Department of Energy) starting in 1994-1995. The Protocol has become the national measurement and verification standard in the United States and many other countries, and has been translated into 10 languages. IPMVP is published in three volumes, most widely downloaded and translated is IPMVP Volume 1 Concepts and Options for Determining Energy and Water Savings. A major driving force was the need for a comm (en)
  • Il Protocollo internazionale di misura e verifica delle prestazioni, è una raccolta delle migliori pratiche oggi disponibili per verificare i risultati di progetti di efficienza energetica, efficienza idrica e fonti rinnovabili in qualsiasi campo, dagli edifici civili ai siti industriali. Questo protocollo è stato sviluppato da un insieme di organizzazioni internazionali (guidate dal dipartimento dell'energia degli Stati Uniti) a partire dal 1994. A fine 2017 è stata pubblicata da EVO la nuova versione del volume "Concetti base" che ha introdotto alcune migliorie, ad esempio: (it)
rdfs:label
  • Protocole international de mesure et de vérification de la performance énergétique (fr)
  • International performance measurement and verification protocol (en)
  • Protocollo internazionale di misura e verifica delle prestazioni (it)
  • Міжнародний протокол вимірювання та верифікації (uk)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License