The Huangdeng Dam is a gravity dam recently completed on the Lancang (Mekong) River in Lanping Bai and Pumi Autonomous County of Yunnan Province, China. The fact that work on the dam was begun without formal approval from the central government was a subject of some controversy. Construction on the dam began in 2010 and its 1,900 MW hydroelectric power station was initially planned to be operational in 2016, with the entire project complete in 2018. The first unit was put into operation in July 2018 and the dam was fully commissioned in January 2019.

Property Value
dbo:Infrastructure/length
  • 0.464
dbo:abstract
  • The Huangdeng Dam is a gravity dam recently completed on the Lancang (Mekong) River in Lanping Bai and Pumi Autonomous County of Yunnan Province, China. The fact that work on the dam was begun without formal approval from the central government was a subject of some controversy. Construction on the dam began in 2010 and its 1,900 MW hydroelectric power station was initially planned to be operational in 2016, with the entire project complete in 2018. The first unit was put into operation in July 2018 and the dam was fully commissioned in January 2019. (en)
  • Le barrage de Huangdeng est un barrage en construction sur le Mékong en Chine, en province du Yunnan. Il est associé à une centrale hydroélectrique de 1 900 MW. Sa construction a débuté en 2010. * Portail des énergies renouvelables * Portail du bâtiment et des travaux publics * Portail de la Chine * Portail des lacs et cours d'eau * Portail sur les barrages (fr)
  • Bendungan Huangdeng adalah sebuah bendungan gravitasi yang kini dirampungkan di Sungai Lancang (Mekong), , Provinsi Yunnan, Tiongkok. Fakta bahwa pengerjaaan terhadap bendungan tersebut tanpa ijin resmi dari pemerintah pusat menjadi subyek dari beberapa kontroversi. Pembangunan bendungan tersebut dimulai pada 2010 dan pembangkit listrik tenaga air bertenaga 1.900 MW awalnya direncanakan beroperasi pada 2016, dengan keseluruhan proyek dirampungkan pada 2018. Unit pertama dioperasikan pada Juli 2018 dan bendungan tersebut sepenuhnya dirampungkan pada Januari 2019. (in)
  • ГЕС Хуанден (黄登水电站) — гідроелектростанція на півдні Китаю у провінції Юньнань. Знаходячись між ГЕС Ліді (вище по течії) та ГЕС Dahuaqiao, входить до складу каскаду на одній з найбільших річок Південно-Східної Азії Меконзі (басейн Південно-Китайського моря). В майбутньому між станціями Ліді та Huangdeng можливе зведення ГЕС Tuoba. В межах проекту річку перекрили греблею із ущільненого котком бетону висотою 203 метри, яка утримує водосховище з об’ємом 15,5 млрд м3 (корисний об’єм 8,3 млрд м3). Машинний зал обладнали чотирма турбінами типу Френсіс потужністю по 475 МВт, які повинні забезпечувати виробництво 8,6 млрд кВт-год електроенергії на рік. Останній енергоблок станції ввели в експлуатацію 1 січня 2019 року. (uk)
  • 黄登水电站是云南省正在建设中的一座水电站,位于云南省西部怒江州兰坪县境内的澜沧江上,距兰坪县城约67公里,距昆明631公里。该水电站属于澜沧江上游河段(古水至苗尾河段)“一库七级”开发方案中的第5个梯级,上接,下邻。由华能澜沧江水电投资建设,静态总投资约149亿元,动态投资173亿元。水电站于2010年开工,计划2011年11月截流,2015年12月首台机组发电,2016年9月竣工,工程总工期81个月。 整个黄登水电站枢纽工程由高204米的碾压混凝土重力坝、坝身泄水建筑物以及左岸地下引水发电系统等组成。建成后,水库正常蓄水水位为1619米,相应库容量为16.13亿立方米。电站装机容量190万千瓦,年发电量85.01亿度,电站建成后除向云南省电网送电外,还将向广东省供电,担负着“西电东送”、“云电外送”的任务。 (zh)
dbo:buildingStartDate
  • January 2010
dbo:buildingStartYear
  • 2010-01-01 (xsd:gYear)
dbo:country
dbo:lake
dbo:length
  • 464.000000 (xsd:double)
dbo:location
dbo:openingYear
  • 2019-01-01 (xsd:gYear)
dbo:part
dbo:purpose
  • Power, irrigation, recreation
dbo:status
  • O
dbo:thumbnail
dbo:volume
  • 3678000.000000 (xsd:double)
dbo:wikiPageID
  • 43083364 (xsd:integer)
dbo:wikiPageLength
  • 3194 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1037818506 (xsd:integer)
dbo:wikiPageWikiLink
dbp:constructionBegan
  • January 2010 (en)
dbp:country
  • China (en)
dbp:damCrosses
  • Lancang (en)
dbp:damHeightThalweg
  • 203 m (en)
dbp:damLength
  • 464 m (en)
dbp:damVolume
  • 3678000.0
dbp:imageCaption
  • Huangdeng During Construction (en)
dbp:location
  • Yunnan Province (en)
dbp:name
  • Huangdeng dam (en)
dbp:opening
  • June 2019 (en)
dbp:owner
  • Yunnan Huaneng Lancang River Hydropower Co., Ltd. (en)
dbp:plantCapacity
  • 1900.0
dbp:plantCommission
  • 2019 (xsd:integer)
dbp:purpose
  • Power, irrigation, recreation (en)
dbp:resCapacityTotal
  • 1.613E9
dbp:status
  • O (en)
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • 26.559166666666666 99.11555555555556
rdf:type
rdfs:comment
  • The Huangdeng Dam is a gravity dam recently completed on the Lancang (Mekong) River in Lanping Bai and Pumi Autonomous County of Yunnan Province, China. The fact that work on the dam was begun without formal approval from the central government was a subject of some controversy. Construction on the dam began in 2010 and its 1,900 MW hydroelectric power station was initially planned to be operational in 2016, with the entire project complete in 2018. The first unit was put into operation in July 2018 and the dam was fully commissioned in January 2019. (en)
  • Le barrage de Huangdeng est un barrage en construction sur le Mékong en Chine, en province du Yunnan. Il est associé à une centrale hydroélectrique de 1 900 MW. Sa construction a débuté en 2010. * Portail des énergies renouvelables * Portail du bâtiment et des travaux publics * Portail de la Chine * Portail des lacs et cours d'eau * Portail sur les barrages (fr)
  • Bendungan Huangdeng adalah sebuah bendungan gravitasi yang kini dirampungkan di Sungai Lancang (Mekong), , Provinsi Yunnan, Tiongkok. Fakta bahwa pengerjaaan terhadap bendungan tersebut tanpa ijin resmi dari pemerintah pusat menjadi subyek dari beberapa kontroversi. Pembangunan bendungan tersebut dimulai pada 2010 dan pembangkit listrik tenaga air bertenaga 1.900 MW awalnya direncanakan beroperasi pada 2016, dengan keseluruhan proyek dirampungkan pada 2018. Unit pertama dioperasikan pada Juli 2018 dan bendungan tersebut sepenuhnya dirampungkan pada Januari 2019. (in)
  • 黄登水电站是云南省正在建设中的一座水电站,位于云南省西部怒江州兰坪县境内的澜沧江上,距兰坪县城约67公里,距昆明631公里。该水电站属于澜沧江上游河段(古水至苗尾河段)“一库七级”开发方案中的第5个梯级,上接,下邻。由华能澜沧江水电投资建设,静态总投资约149亿元,动态投资173亿元。水电站于2010年开工,计划2011年11月截流,2015年12月首台机组发电,2016年9月竣工,工程总工期81个月。 整个黄登水电站枢纽工程由高204米的碾压混凝土重力坝、坝身泄水建筑物以及左岸地下引水发电系统等组成。建成后,水库正常蓄水水位为1619米,相应库容量为16.13亿立方米。电站装机容量190万千瓦,年发电量85.01亿度,电站建成后除向云南省电网送电外,还将向广东省供电,担负着“西电东送”、“云电外送”的任务。 (zh)
  • ГЕС Хуанден (黄登水电站) — гідроелектростанція на півдні Китаю у провінції Юньнань. Знаходячись між ГЕС Ліді (вище по течії) та ГЕС Dahuaqiao, входить до складу каскаду на одній з найбільших річок Південно-Східної Азії Меконзі (басейн Південно-Китайського моря). В майбутньому між станціями Ліді та Huangdeng можливе зведення ГЕС Tuoba. В межах проекту річку перекрили греблею із ущільненого котком бетону висотою 203 метри, яка утримує водосховище з об’ємом 15,5 млрд м3 (корисний об’єм 8,3 млрд м3). Останній енергоблок станції ввели в експлуатацію 1 січня 2019 року. (uk)
rdfs:label
  • Bendungan Huangdeng (in)
  • Huangdeng Dam (en)
  • Barrage de Huangdeng (fr)
  • 黄登水电站 (zh)
  • Хуанден (uk)
owl:sameAs
geo:geometry
  • POINT(99.11555480957 26.55916595459)
geo:lat
  • 26.559166 (xsd:float)
geo:long
  • 99.115555 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Huangdeng dam (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License