An Entity of Type: Tied-arch bridge, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Hastings Bridge is a free standing tied-arch bridge that spans the Mississippi River in Hastings, Minnesota, United States. It was designed by Parsons and was built in 2013 by Lunda Construction Company for $119,830,000. The Hastings Bridge replaces the former Hastings High Bridge, which was built in 1951 and demolished in 2013 when the replacement bridge was completed. The Hastings High Bridge had been scheduled to be torn down and replaced in 2019, but after the I-35W bridge collapse in Minneapolis, the MNDOT re-prioritized the replacement and construction of the new bridge started in 2010.

Property Value
dbo:Infrastructure/length
  • 0.5907024
dbo:abstract
  • The Hastings Bridge is a free standing tied-arch bridge that spans the Mississippi River in Hastings, Minnesota, United States. It was designed by Parsons and was built in 2013 by Lunda Construction Company for $119,830,000. The Hastings Bridge replaces the former Hastings High Bridge, which was built in 1951 and demolished in 2013 when the replacement bridge was completed. The Hastings High Bridge had been scheduled to be torn down and replaced in 2019, but after the I-35W bridge collapse in Minneapolis, the MNDOT re-prioritized the replacement and construction of the new bridge started in 2010. Following the August 1, 2007 collapse of the I-35W Mississippi River bridge, the Hastings High Bridge was inspected between August 20 and August 31, 2007. An executive summary of the inspection report was released on January 15, 2008, questioning whether the bridge was capable of sustaining its 40-ton posted capacity, and calling for a load analysis to be performed immediately. Because the existing bridge was obsolete and average daily traffic exceeded 30,000 vehicles, MNDOT accelerated the new bridge project to begin in 2010. Three design-build teams submitted proposals on June 30, 2010, and the contract was awarded to the joint venture Lunda/Ames. In June 2013, two of the four lanes of the new bridge were open for traffic, and in November 2013 all four lanes opened. The new bridge cost $130 million and is the longest free-standing tied-arch bridge in North America, at a length of 545 feet. The main span is composed of arches, girders, beams, stringers, and roadway, offering four lanes of traffic plus twelve feet of mixed use pedestrian and bike path. The new bridge has an anti-icing system. Other features include: a public art mural on the south abutment wall, a scenic overlook incorporated near Levee Park, additional parking beneath the bridge, and lighting. The new bridge is expected to have a 100-year lifespan. (en)
dbo:bridgeCarries
  • Four lanes of
dbo:crosses
dbo:length
  • 590.702400 (xsd:double)
dbo:locatedInArea
dbo:mainspan
  • 166.116000 (xsd:double)
dbo:maintainedBy
dbo:openingYear
  • 2013-01-01 (xsd:gYear)
dbo:thumbnail
dbo:type
dbo:unitedStatesNationalBridgeId
  • 19004
dbo:vehiclesPerDay
  • 32500 (xsd:nonNegativeInteger)
dbo:width
  • 21.915120 (xsd:double)
dbo:wikiPageID
  • 43047148 (xsd:integer)
dbo:wikiPageLength
  • 3153 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1090063327 (xsd:integer)
dbo:wikiPageWikiLink
dbp:below
  • 62.3
dbp:bridgeName
  • Hastings Bridge (en)
dbp:carries
  • Four lanes of (en)
dbp:crosses
dbp:design
dbp:id
  • 19004 (xsd:integer)
dbp:imageSize
  • 300 (xsd:integer)
dbp:length
  • 1938.0
dbp:locale
  • Hastings, Minnesota, U.S. (en)
dbp:mainspan
  • 545.0
dbp:maint
dbp:open
  • 2013 (xsd:integer)
dbp:traffic
  • 32500 (xsd:integer)
dbp:width
  • 71.9
dbp:wikiPageUsesTemplate
dcterms:subject
georss:point
  • 44.7468 -92.85299983333333
rdf:type
rdfs:comment
  • The Hastings Bridge is a free standing tied-arch bridge that spans the Mississippi River in Hastings, Minnesota, United States. It was designed by Parsons and was built in 2013 by Lunda Construction Company for $119,830,000. The Hastings Bridge replaces the former Hastings High Bridge, which was built in 1951 and demolished in 2013 when the replacement bridge was completed. The Hastings High Bridge had been scheduled to be torn down and replaced in 2019, but after the I-35W bridge collapse in Minneapolis, the MNDOT re-prioritized the replacement and construction of the new bridge started in 2010. (en)
rdfs:label
  • Hastings Bridge (en)
owl:sameAs
geo:geometry
  • POINT(-92.852996826172 44.746799468994)
geo:lat
  • 44.746799 (xsd:float)
geo:long
  • -92.852997 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Hastings Bridge (en)
is dbo:wikiPageWikiLink of
is dbp:bridge of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License