The Hanjialing–Yuanping railway, also known as the Hanyuan Railway (Chinese: 韩原铁路; pinyin: Hán yuán tiělù), also known as the North Tongpu four-track railway, is a north–south railway located in Shanxi Province. It is the northern part of the Datong–Puzhou railway (Tongpu railway) running from in the south to the Datong–Qinhuangdao railway at Hanjialing. The line is a national class I double-track, electrified railway with a total length of 153 kilometres and a design speed of 160 kilometres per hour, built entirely with heavy-duty track. The whole line opened for freight traffic on 25 February 2014 and passenger services commenced on March 29 of the same year. Construction of two extra tracks was completed on 1 May 2019.

Property Value
dbo:abstract
  • The Hanjialing–Yuanping railway, also known as the Hanyuan Railway (Chinese: 韩原铁路; pinyin: Hán yuán tiělù), also known as the North Tongpu four-track railway, is a north–south railway located in Shanxi Province. It is the northern part of the Datong–Puzhou railway (Tongpu railway) running from in the south to the Datong–Qinhuangdao railway at Hanjialing. The line is a national class I double-track, electrified railway with a total length of 153 kilometres and a design speed of 160 kilometres per hour, built entirely with heavy-duty track. The whole line opened for freight traffic on 25 February 2014 and passenger services commenced on March 29 of the same year. Construction of two extra tracks was completed on 1 May 2019. Considering actual needs and economic benefits, the National Development and Reform Commission approved the Datong-Xi'an railway project plan ("The National Development and Reform Commission's Response in relation to the Feasibility Study Report for the New Datong-Xi'an Railway") in 2009, allowing the construction of third and fourth tracks for passenger traffic from Datong to Yuanping next to the North Tongpu Railway, then under construction. The additional tracks were opened next to the original Hanyuan Railway in 2019 to connect with the new Dazhang high-speed railway. (en)
  • 韩原铁路,即韩原线,又称北同蒲四线、北同蒲三、四线,是一条位于山西省北部,南起北同蒲原平站,北至大秦铁路线源头起始车站韩家岭站的铁路,正线全长153公里。该线为国家I级双线电气化铁路,正线全长153公里,设计时速160公里,全部采用重型轨道。全线2014年2月25日开通货运 ,同年3月29日开通客运。2019年5月1日开行动车组列车。 出于实际需求及经济效益等方面的考虑,2009年,国家发改委批复大同至西安铁路项目方案时(《国家发展改革委关于新建大同至西安铁路可行性研究报告的批复》,发改基础[2009]3010号),确定大同至原平段利用在建的北同蒲铁路第三、四线改造建设。韩原线于2019年增设大路辛庄线路所,并由该线路所新建韩原铁路至大张客运专线太善村线路所的联络线。 (zh)
dbo:isPartOf
dbo:lineLength
  • 153000.000000 (xsd:double)
dbo:location
dbo:openingDate
  • 2014-02-25 (xsd:date)
dbo:openingYear
  • 2014-01-01 (xsd:gYear)
dbo:operator
dbo:routeEnd
dbo:speedLimit
  • 160.000000 (xsd:double)
dbo:status
  • In operation
dbo:wikiPageID
  • 64312051 (xsd:integer)
dbo:wikiPageLength
  • 5374 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1007807870 (xsd:integer)
dbo:wikiPageWikiLink
dbp:character
  • Passenger and freight (en)
dbp:end
dbp:locale
dbp:logoWidth
  • 100 (xsd:integer)
dbp:mapState
  • collapsed (en)
dbp:maxincline
  • 0.6
dbp:minradius
  • , in difficult areas (en)
dbp:name
  • Hanjialing–Yuanping railway (en)
dbp:open
  • 2014-02-25 (xsd:date)
dbp:operator
dbp:otherName
  • Hanyuan railway (en)
dbp:p
  • Hán yuán tiělù (en)
dbp:s
  • 韩原铁路 (en)
dbp:speed
  • with capacity to increase to (en)
dbp:start
  • Hanjialing (en)
dbp:status
  • In operation (en)
dbp:system
dbp:type
  • Class I railway (en)
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • 韩原铁路,即韩原线,又称北同蒲四线、北同蒲三、四线,是一条位于山西省北部,南起北同蒲原平站,北至大秦铁路线源头起始车站韩家岭站的铁路,正线全长153公里。该线为国家I级双线电气化铁路,正线全长153公里,设计时速160公里,全部采用重型轨道。全线2014年2月25日开通货运 ,同年3月29日开通客运。2019年5月1日开行动车组列车。 出于实际需求及经济效益等方面的考虑,2009年,国家发改委批复大同至西安铁路项目方案时(《国家发展改革委关于新建大同至西安铁路可行性研究报告的批复》,发改基础[2009]3010号),确定大同至原平段利用在建的北同蒲铁路第三、四线改造建设。韩原线于2019年增设大路辛庄线路所,并由该线路所新建韩原铁路至大张客运专线太善村线路所的联络线。 (zh)
  • The Hanjialing–Yuanping railway, also known as the Hanyuan Railway (Chinese: 韩原铁路; pinyin: Hán yuán tiělù), also known as the North Tongpu four-track railway, is a north–south railway located in Shanxi Province. It is the northern part of the Datong–Puzhou railway (Tongpu railway) running from in the south to the Datong–Qinhuangdao railway at Hanjialing. The line is a national class I double-track, electrified railway with a total length of 153 kilometres and a design speed of 160 kilometres per hour, built entirely with heavy-duty track. The whole line opened for freight traffic on 25 February 2014 and passenger services commenced on March 29 of the same year. Construction of two extra tracks was completed on 1 May 2019. (en)
rdfs:label
  • Hanjialing–Yuanping railway (en)
  • 韩原铁路 (zh)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • Hanjialing–Yuanping railway (en)
is dbo:servingRailwayLine of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is dbp:line of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License