The Guêpe-class submarines were a planned class of submarines to be built for the French Navy ordered in 1904. Ten of the class were projected but only two were laid down before the whole project was cancelled. Construction of the two vessels that were laid down began in 1906, but it was stopped in 1908 before they could be completed.
Property | Value |
---|---|
dbo:MeanOfTransportation/length |
|
dbo:abstract |
|
dbo:length |
|
dbo:shipBeam |
|
dbo:topSpeed |
|
dbo:type | |
dbo:wikiPageExternalLink | |
dbo:wikiPageID |
|
dbo:wikiPageLength |
|
dbo:wikiPageRevisionID |
|
dbo:wikiPageWikiLink |
|
dbp:builtRange |
|
dbp:name |
|
dbp:operators |
|
dbp:shipArmament |
|
dbp:shipComplement |
|
dbp:shipDisplacement |
|
dbp:shipPropulsion |
|
dbp:shipRange |
|
dbp:shipSpeed |
|
dbp:shipType | |
dbp:totalShipsCancelled |
|
dbp:totalShipsCompleted |
|
dbp:totalShipsPlanned |
|
dbp:wikiPageUsesTemplate | |
dcterms:subject | |
rdf:type | |
rdfs:comment |
|
rdfs:label |
|
owl:sameAs | |
prov:wasDerivedFrom | |
foaf:isPrimaryTopicOf | |
is dbo:wikiPageDisambiguates of | |
is dbo:wikiPageWikiLink of | |
is foaf:primaryTopic of |