An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Gulpur Hydropower Plant (GHPP) is an operational run-of-the-river hydroelectric generation project located on Poonch River, a major tributary of Jhelum River near Gulpur in Kotli District of Azad Kashmir, Pakistan. The site is about 167 km from Federal Capital Islamabad and 285 kilometres (177 mi) from Punjab's Provincial Capital Lahore and is approachable directly from Islamabad and Lahore by a two-lane, all-weather, paved, partly mountainous road. The location of the project is about 28 km upstream of Mangla Dam Reservoir.

Property Value
dbo:Infrastructure/length
  • 0.238
dbo:abstract
  • Gulpur Hydropower Plant (GHPP) is an operational run-of-the-river hydroelectric generation project located on Poonch River, a major tributary of Jhelum River near Gulpur in Kotli District of Azad Kashmir, Pakistan. The site is about 167 km from Federal Capital Islamabad and 285 kilometres (177 mi) from Punjab's Provincial Capital Lahore and is approachable directly from Islamabad and Lahore by a two-lane, all-weather, paved, partly mountainous road. The location of the project is about 28 km upstream of Mangla Dam Reservoir. Gulpur Hydropower Project is a run-of-the-river project designed for the generation of 100 megawatts (130,000 hp) consisting of two Kaplan-type turbine units with an average energy output of 436 Gwh. Gulpur Hydropower Project is a part of least-cost energy generation plan, being executed by WAPDA to harness the indigenous hydropower resources of the country. WAPDA awarded the contract to MIRA Power Limited, a subsidiary of Korean company KOSEP, an independent power producer (IPP) being developed in the private sector on a BOOT basis (Build, Own, Operate and Transfer) under Government of Pakistan Policy for Power Generation Projects 2002 as adopted in Azad Jammu & Kashmir. The project has the capability of generating an average annual energy of 465 GWh. (en)
  • ГЕС Гулпур — гідроелектростанція, що споруджується на півночі Пакистану. Використовуватиме ресурс із річки Кунар, яка в свою чергу є лівою притокою Кабулу (впадає праворуч до Інду). В межах проекту річку перекриють бетонною гравітаційною греблею висотою 67 метрів та довжиною 205 метрів, яка утримуватиме водосховище з об'ємом 21,9 млн м3. Звідси ресурс через два тунелі завдовжки по 0,15 км з діаметрами 5 метрів спрямовуватиметься машинного залу, розташованого на правому березі Кунару майже за 1 км нижче від греблі (після останньої річка описує петлю). Основне обладнання станції становитимуть дві турбіни типу Френсіс потужністю по 52 МВт, які працюватимуть при напорі 57 метрів. Видача продукції відбуватиметься по ЛЕП, розрахованій на роботу під напругою 132 кВ. Введення станції в експлуатацію заплановане на 2019 рік. (uk)
dbo:buildingStartDate
  • January 2014
dbo:buildingStartYear
  • 2014-01-01 (xsd:gYear)
dbo:description
  • Gravity,roller-compacted concrete (en)
dbo:height
  • 35.000000 (xsd:double)
dbo:lake
dbo:length
  • 238.000000 (xsd:double)
dbo:location
dbo:openingYear
  • 2020-01-01 (xsd:gYear)
dbo:part
dbo:river
dbo:status
  • Operational
dbo:wikiPageID
  • 42379111 (xsd:integer)
dbo:wikiPageLength
  • 7871 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1119940001 (xsd:integer)
dbo:wikiPageWikiLink
dbp:constructionBegan
  • January 2014 (en)
dbp:damCrosses
  • Poonch River, a tributary of Jhelum River (en)
dbp:damType
  • Gravity, roller-compacted concrete (en)
dbp:location
  • Gulpur, Kotli District, Kotli Town of AJK, Pakistan (en)
dbp:locationMap
  • Pakistan (en)
dbp:name
  • Gulpur Hydropower Plant (en)
dbp:nameOfficial
  • Gulpur Hydropower Plant (en)
dbp:opening
  • February 2020 (en)
dbp:owner
  • Mira Power Private Limited (en)
dbp:plantAnnualGen
  • 465.0
dbp:plantCapacity
  • 102 (xsd:integer)
dbp:plantCommission
  • February 2020 (en)
dbp:plantName
  • Gulpur Hydroelectric Plant (en)
dbp:plantOperator
dbp:plantTurbines
  • 2 (xsd:integer)
dbp:status
  • Operational (en)
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • 33.45527777777778 73.8625
rdf:type
rdfs:comment
  • Gulpur Hydropower Plant (GHPP) is an operational run-of-the-river hydroelectric generation project located on Poonch River, a major tributary of Jhelum River near Gulpur in Kotli District of Azad Kashmir, Pakistan. The site is about 167 km from Federal Capital Islamabad and 285 kilometres (177 mi) from Punjab's Provincial Capital Lahore and is approachable directly from Islamabad and Lahore by a two-lane, all-weather, paved, partly mountainous road. The location of the project is about 28 km upstream of Mangla Dam Reservoir. (en)
  • ГЕС Гулпур — гідроелектростанція, що споруджується на півночі Пакистану. Використовуватиме ресурс із річки Кунар, яка в свою чергу є лівою притокою Кабулу (впадає праворуч до Інду). В межах проекту річку перекриють бетонною гравітаційною греблею висотою 67 метрів та довжиною 205 метрів, яка утримуватиме водосховище з об'ємом 21,9 млн м3. Звідси ресурс через два тунелі завдовжки по 0,15 км з діаметрами 5 метрів спрямовуватиметься машинного залу, розташованого на правому березі Кунару майже за 1 км нижче від греблі (після останньої річка описує петлю). (uk)
rdfs:label
  • Gulpur Hydropower Project (en)
  • ГЕС Гулпур (uk)
owl:sameAs
geo:geometry
  • POINT(73.862503051758 33.455276489258)
geo:lat
  • 33.455276 (xsd:float)
geo:long
  • 73.862503 (xsd:float)
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • Gulpur Hydropower Plant (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License