Granville Harbour Wind Farm is a wind farm operated by Palisade Investment Partners, on the west coast of Tasmania, Australia. The facility first generated to the grid on 27 February 2020 with the completion of its first turbine, with the site being fully commissioned and operational in December 2020. The wind farm has 31 wind turbines and have a maximum capacity of 112 MW. It is located on a site 35 kilometres (22 mi) northwest of Zeehan, Tasmania.
Property | Value |
---|---|
dbo:abstract |
|
dbo:averageAnnualGeneration |
|
dbo:buildingStartDate |
|
dbo:buildingStartYear |
|
dbo:capacityFactor |
|
dbo:country | |
dbo:installedCapacity |
|
dbo:location | |
dbo:openingYear |
|
dbo:status |
|
dbo:wikiPageExternalLink | |
dbo:wikiPageID |
|
dbo:wikiPageLength |
|
dbo:wikiPageRevisionID |
|
dbo:wikiPageWikiLink | |
dbp:commissioned |
|
dbp:constructionBegan |
|
dbp:cost |
|
dbp:country |
|
dbp:location | |
dbp:name |
|
dbp:operator |
|
dbp:psAnnualGeneration |
|
dbp:psElectricalCapFac |
|
dbp:psElectricalCapacity |
|
dbp:psUnitsManuModel |
|
dbp:psUnitsOperational |
|
dbp:status |
|
dbp:website | |
dbp:wikiPageUsesTemplate | |
dbp:windFarmType |
|
dcterms:subject | |
georss:point |
|
rdf:type | |
rdfs:comment |
|
rdfs:label |
|
owl:sameAs | |
geo:geometry |
|
geo:lat |
|
geo:long |
|
prov:wasDerivedFrom | |
foaf:homepage | |
foaf:isPrimaryTopicOf | |
foaf:name |
|
is dbo:wikiPageWikiLink of | |
is foaf:primaryTopic of |