The Gorakhpur Nuclear Power Plant or the Gorakhpur Haryana Anu Vidyut Pariyojana (GHAVP) is a proposed nuclear power plant to be built on a 560 hectares (1,400 acres) area west of Gorakhpur village of Fatehabad district of Haryana. The foundation stone of the 2800 megawatt nuclear power plant was laid on 13 January 2014. The first phase of the project will have an installed capacity of 1400 MW and was expected to be completed by 2025, however the deadline has been now extended to 2028. The construction of second phase will gather pace afterwards, which will double the capacity to 2800 MW.

Property Value
dbo:abstract
  • The Gorakhpur Nuclear Power Plant or the Gorakhpur Haryana Anu Vidyut Pariyojana (GHAVP) is a proposed nuclear power plant to be built on a 560 hectares (1,400 acres) area west of Gorakhpur village of Fatehabad district of Haryana. The foundation stone of the 2800 megawatt nuclear power plant was laid on 13 January 2014. The first phase of the project will have an installed capacity of 1400 MW and was expected to be completed by 2025, however the deadline has been now extended to 2028. The construction of second phase will gather pace afterwards, which will double the capacity to 2800 MW. (en)
  • ゴラクプール原子力発電所(英語: Gorakhpur Nuclear Power Plant)はインドのハリヤーナー州、で建設が提案されている原子力発電所。Gorakhpur Haryana Anu Vidyut Pariyojana(GHAVP)とも呼ばれる。 原子力発電所の礎石は2014年1月13日に設置された。計画の第1期では1400MWの発電量を導入し、2021年までの完成を見込んでおり、完成後の第2期で2倍の発電量、合計2800MWを目指す。 2015年に1から4号機の立地許可が出された。2018年3月24日に掘削工事が開始した。 (ja)
  • La centrale nucleare di Kumharia, è una centrale nucleare indiana situata presso la città di , nel Distretto di Fatehabad nello stato di Haryana. La centrale è attualmente in progettazione, sono previsti 4 reattori PHWR per 2560MW. L'inizio della costruzione dei primi reattori non è ancora pianificata, benché si presume che la preparazione del sito inizi per il 2012. (it)
dbo:buildingStartDate
  • Unit 1 & 2: January 2018
dbo:buildingStartYear
  • 2018-01-01 (xsd:gYear)
dbo:location
dbo:openingYear
  • 0001-01-01 (xsd:gYear)
dbo:operator
dbo:owner
dbo:status
  • Under Construction
dbo:thumbnail
dbo:wikiPageID
  • 41850764 (xsd:integer)
dbo:wikiPageLength
  • 9609 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1114802557 (xsd:integer)
dbo:wikiPageWikiLink
dbp:commissioned
  • Unit 1 & 2: 2028 (en)
dbp:constructionBegan
  • Unit 1 & 2: January 2018 (en)
dbp:country
  • India (en)
dbp:location
dbp:locationMapCaption
  • Location of Gorakhpur Nuclear Power Plant in Haryana (en)
dbp:name
  • Gorakhpur Nuclear Power Plant (en)
dbp:nameOfficial
  • Gorakhpur Haryana Anu Vidyut Pariyojana (en)
dbp:npReactorSupplier
dbp:npReactorType
dbp:operator
dbp:owner
dbp:psCoolingSource
dbp:psUnitsPlanned
  • 2 (xsd:integer)
dbp:psUnitsUc
  • 2 (xsd:integer)
dbp:status
  • Under Construction (en)
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • 29.441388888888888 75.63222222222223
rdf:type
rdfs:comment
  • The Gorakhpur Nuclear Power Plant or the Gorakhpur Haryana Anu Vidyut Pariyojana (GHAVP) is a proposed nuclear power plant to be built on a 560 hectares (1,400 acres) area west of Gorakhpur village of Fatehabad district of Haryana. The foundation stone of the 2800 megawatt nuclear power plant was laid on 13 January 2014. The first phase of the project will have an installed capacity of 1400 MW and was expected to be completed by 2025, however the deadline has been now extended to 2028. The construction of second phase will gather pace afterwards, which will double the capacity to 2800 MW. (en)
  • ゴラクプール原子力発電所(英語: Gorakhpur Nuclear Power Plant)はインドのハリヤーナー州、で建設が提案されている原子力発電所。Gorakhpur Haryana Anu Vidyut Pariyojana(GHAVP)とも呼ばれる。 原子力発電所の礎石は2014年1月13日に設置された。計画の第1期では1400MWの発電量を導入し、2021年までの完成を見込んでおり、完成後の第2期で2倍の発電量、合計2800MWを目指す。 2015年に1から4号機の立地許可が出された。2018年3月24日に掘削工事が開始した。 (ja)
  • La centrale nucleare di Kumharia, è una centrale nucleare indiana situata presso la città di , nel Distretto di Fatehabad nello stato di Haryana. La centrale è attualmente in progettazione, sono previsti 4 reattori PHWR per 2560MW. L'inizio della costruzione dei primi reattori non è ancora pianificata, benché si presume che la preparazione del sito inizi per il 2012. (it)
rdfs:label
  • Gorakhpur Nuclear Power Plant (en)
  • Centrale nucleare di Kumharia (it)
  • ゴラクプール原子力発電所 (ja)
owl:sameAs
geo:geometry
  • POINT(75.632225036621 29.441389083862)
geo:lat
  • 29.441389 (xsd:float)
geo:long
  • 75.632225 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Gorakhpur Nuclear Power Plant (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License