Fibrominn, located in Benson, Minnesota, was the first power plant in the United States designed to burn poultry litter as its main source of fuel. It produced 55 megawatts of electric power by burning turkey manure combined with wood chips. All of the energy produced was required by state lawmakers to be purchased by Xcel Energy. The plant was developed by Fibrowatt LLC, part of the Homeland Renewable Energy Group, which was set up by the management team which built the world's first three poultry-litter-fueled power plants (in the UK). Construction began in 2005 and the plant began operating in 2007. Grand opening ceremonies were held on 12 October 2007 and 13 October 2007. The State of Minnesota required that the Xcel purchase power from the plant until at least 2028. The plant at one p

Property Value
dbo:abstract
  • Fibrominn, located in Benson, Minnesota, was the first power plant in the United States designed to burn poultry litter as its main source of fuel. It produced 55 megawatts of electric power by burning turkey manure combined with wood chips. All of the energy produced was required by state lawmakers to be purchased by Xcel Energy. The plant was developed by Fibrowatt LLC, part of the Homeland Renewable Energy Group, which was set up by the management team which built the world's first three poultry-litter-fueled power plants (in the UK). Construction began in 2005 and the plant began operating in 2007. Grand opening ceremonies were held on 12 October 2007 and 13 October 2007. The State of Minnesota required that the Xcel purchase power from the plant until at least 2028. The plant at one point had been owned by ContourGlobal, LP. However, the cost of generating energy from the unique supply of biomass became increasingly costly compared to other renewable sources. In 2017, Xcel Energy successfully lobbied state lawmakers to allow it to buy the plant in order to decommission it because the high cost of operations were being forced onto ratepayers. In 2018 Xcel paid $24.5-million to the plant's owners and was expected to pay the city of Benson as much as $20-million over a period of years to make up for the city's loss of expected revenue once the plant closed. In 2018, there was an effort by Brightmark Energy of San Francisco to purchase the plant and covert it for use in generating renewable natural gas from turkey litter and other biomass, however after 18-months the project never materialized and the effort failed. Xcel noted in regulatory filings that the plant's closure would eventually save ratepayers hundreds of millions of dollars over roughly 10 years. The plant was demolished in August 2019. (en)
dbo:location
dbo:openingYear
  • 2007-01-01 (xsd:gYear)
dbo:owner
dbo:status
  • Operational
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 1956903 (xsd:integer)
dbo:wikiPageLength
  • 3274 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 940981872 (xsd:integer)
dbo:wikiPageWikiLink
dbp:commissioned
  • October 2007 (en)
dbp:location
dbp:name
  • Fibrominn (en)
dbp:owner
  • ContourGlobal, LP (en)
dbp:psElectricalCapacity
  • 55 (xsd:integer)
dbp:status
  • Operational (en)
dbp:thFuelPrimary
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • 45.32222222222222 -95.63
rdf:type
rdfs:comment
  • Fibrominn, located in Benson, Minnesota, was the first power plant in the United States designed to burn poultry litter as its main source of fuel. It produced 55 megawatts of electric power by burning turkey manure combined with wood chips. All of the energy produced was required by state lawmakers to be purchased by Xcel Energy. The plant was developed by Fibrowatt LLC, part of the Homeland Renewable Energy Group, which was set up by the management team which built the world's first three poultry-litter-fueled power plants (in the UK). Construction began in 2005 and the plant began operating in 2007. Grand opening ceremonies were held on 12 October 2007 and 13 October 2007. The State of Minnesota required that the Xcel purchase power from the plant until at least 2028. The plant at one p (en)
rdfs:label
  • Fibrominn (en)
owl:sameAs
geo:geometry
  • POINT(-95.629997253418 45.32222366333)
geo:lat
  • 45.322224 (xsd:float)
geo:long
  • -95.629997 (xsd:float)
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • Fibrominn (en)
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License