About: Deralok Dam

An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Rashava-Deralok Dam is a gravity dam currently being constructed on the Great Zab River, just upstream of the town of Deralok in Dohuk Governorate, Kurdistan region of Iraq. The dam will support a 37.6 MW run-of-the-river hydroelectric power station, with the primary purpose to address continued power shortfalls in the region, most precisely to supply the towns of Amadiya and Badinan. According to Kurdish Prime Minister Nechirvan Barzani, it is the first hydropower project launched by the Kurdistan Regional Government.

Property Value
dbo:Infrastructure/length
  • 0.119 (dbd:kilometre)
dbo:abstract
  • The Rashava-Deralok Dam is a gravity dam currently being constructed on the Great Zab River, just upstream of the town of Deralok in Dohuk Governorate, Kurdistan region of Iraq. The dam will support a 37.6 MW run-of-the-river hydroelectric power station, with the primary purpose to address continued power shortfalls in the region, most precisely to supply the towns of Amadiya and Badinan. According to Kurdish Prime Minister Nechirvan Barzani, it is the first hydropower project launched by the Kurdistan Regional Government. (en)
dbo:buildingStartDate
  • October 2016
dbo:buildingStartYear
  • 2016-01-01 (xsd:gYear)
dbo:country
dbo:description
  • Gravity, diversion weir (en)
dbo:elevation
  • 640.000000 (xsd:double)
dbo:height
  • 30.000000 (xsd:double)
dbo:length
  • 119.000000 (xsd:double)
dbo:location
dbo:openingYear
  • 2020-01-01 (xsd:gYear)
dbo:owner
dbo:part
dbo:purpose
  • Power, flood control
dbo:river
dbo:status
  • UC
dbo:volume
  • 200000.000000 (xsd:double)
dbo:wikiPageID
  • 50252192 (xsd:integer)
dbo:wikiPageLength
  • 4367 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1071337398 (xsd:integer)
dbo:wikiPageWikiLink
dbp:constructionBegan
  • October 2016 (en)
dbp:cost
  • 1.68E8 (dbd:usDollar)
dbp:country
dbp:damCrosses
dbp:damElevationCrest
  • 640 m (en)
dbp:damHeightFoundation
  • 29 m (en)
dbp:damHeightThalweg
  • 26 m (en)
dbp:damLength
  • 119 m (en)
dbp:damType
  • Gravity, diversion weir (en)
dbp:damVolume
  • 200000.0 (dbd:cubicMetre)
dbp:damWidthCrest
  • 5.5 m (en)
dbp:location
dbp:locationMap
  • Iraq (en)
dbp:name
  • Rashava-Deralok Dam (en)
dbp:opening
  • 2020 (xsd:integer)
dbp:owner
  • Kurdistan Regional Government (en)
dbp:plantCapacity
  • 37.6 (dbd:megawatt)
dbp:plantCommission
  • 2020 (xsd:integer)
dbp:plantHydraulicHead
  • 17 m (en)
dbp:plantName
  • Deralok Hydropower Station (en)
dbp:plantTurbines
  • 2 (xsd:integer)
dbp:plantType
  • R (en)
dbp:purpose
  • Power, flood control (en)
dbp:status
  • UC (en)
dbp:wikiPageUsesTemplate
dct:subject
georss:point
  • 37.07138888888889 43.658055555555556
rdf:type
rdfs:comment
  • The Rashava-Deralok Dam is a gravity dam currently being constructed on the Great Zab River, just upstream of the town of Deralok in Dohuk Governorate, Kurdistan region of Iraq. The dam will support a 37.6 MW run-of-the-river hydroelectric power station, with the primary purpose to address continued power shortfalls in the region, most precisely to supply the towns of Amadiya and Badinan. According to Kurdish Prime Minister Nechirvan Barzani, it is the first hydropower project launched by the Kurdistan Regional Government. (en)
rdfs:label
  • Deralok Dam (en)
owl:sameAs
geo:geometry
  • POINT(43.658054351807 37.071388244629)
geo:lat
  • 37.071388 (xsd:float)
geo:long
  • 43.658054 (xsd:float)
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • Rashava-Deralok Dam (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License