About: Dandy Dam

An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Dandy Dam is small earth-filled dam in what was previously the North Waziristan District of the Khyber Pakhtunkhwa, Pakistan. Construction was started in 2008 and completed in 2011 at a cost of PKR 553 million. The dam has a height of 101 feet, covered a length of around 1764 feet, with water storage capacity of 2907 acre feet. The dam irrigates around 2000 acres.

Property Value
dbo:Infrastructure/length
  • 0.5376672
dbo:abstract
  • Dandy Dam is small earth-filled dam in what was previously the North Waziristan District of the Khyber Pakhtunkhwa, Pakistan. Construction was started in 2008 and completed in 2011 at a cost of PKR 553 million. The dam has a height of 101 feet, covered a length of around 1764 feet, with water storage capacity of 2907 acre feet. The dam irrigates around 2000 acres. (en)
dbo:buildingStartDate
  • 2008
dbo:buildingStartYear
  • 2008-01-01 (xsd:gYear)
dbo:country
dbo:description
  • Earth Filled (en)
dbo:height
  • 30.784800 (xsd:double)
dbo:length
  • 537.667200 (xsd:double)
dbo:location
dbo:openingYear
  • 2011-01-01 (xsd:gYear)
dbo:owner
dbo:part
dbo:status
  • O
dbo:wikiPageID
  • 43369135 (xsd:integer)
dbo:wikiPageLength
  • 3383 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1058794549 (xsd:integer)
dbo:wikiPageWikiLink
dbp:constructionBegan
  • 2008 (xsd:integer)
dbp:cost
  • 5.53E8
dbp:country
dbp:damHeight
  • 101.0
dbp:damLength
  • 1764.0
dbp:damType
  • Earth Filled (en)
dbp:location
dbp:locationMap
  • Pakistan (en)
dbp:name
  • Dandy Dam (en)
dbp:opening
  • 2011 (xsd:integer)
dbp:owner
dbp:resCapacityTotal
  • 2907 (xsd:integer)
dbp:resCatchment
  • 67.979000 (xsd:double)
dbp:status
  • O (en)
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • 33.06366944444444 70.00740555555555
rdf:type
rdfs:comment
  • Dandy Dam is small earth-filled dam in what was previously the North Waziristan District of the Khyber Pakhtunkhwa, Pakistan. Construction was started in 2008 and completed in 2011 at a cost of PKR 553 million. The dam has a height of 101 feet, covered a length of around 1764 feet, with water storage capacity of 2907 acre feet. The dam irrigates around 2000 acres. (en)
rdfs:label
  • Dandy Dam (en)
owl:sameAs
geo:geometry
  • POINT(70.00740814209 33.063671112061)
geo:lat
  • 33.063671 (xsd:float)
geo:long
  • 70.007408 (xsd:float)
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • Dandy Dam (en)
is dbo:wikiPageDisambiguates of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License