An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Cinere–Jagorawi Toll Road or Cijago Toll Road is a 14.64-kilometre (14.64 km) toll road which extends from Cimanggis to Cinere in West Java, Indonesia. This toll road is part of the Jakarta Outer Ring Road 2. The toll road is connected to Jagorawi Toll Road, Depok-Antasari Toll Road and Cinere-Serpong Toll Road. Section 1 from Cisalak to Jagorawi was inaugurated on January 27, 2012, which is 3.7 kilometres (2.3 mi) in length. The toll road is expected to be completed by the end of 2018. Metro and long distance and long or medium distances from Depok can use this toll road, without passing Lenteng Agung and Pasar Minggu.

Property Value
dbo:Infrastructure/length
  • 14.64
dbo:abstract
  • Cinere–Jagorawi Toll Road or Cijago Toll Road is a 14.64-kilometre (14.64 km) toll road which extends from Cimanggis to Cinere in West Java, Indonesia. This toll road is part of the Jakarta Outer Ring Road 2. The toll road is connected to Jagorawi Toll Road, Depok-Antasari Toll Road and Cinere-Serpong Toll Road. Section 1 from Cisalak to Jagorawi was inaugurated on January 27, 2012, which is 3.7 kilometres (2.3 mi) in length. The toll road is expected to be completed by the end of 2018. Metro and long distance and long or medium distances from Depok can use this toll road, without passing Lenteng Agung and Pasar Minggu. (en)
  • Jalan Tol Cinere-Jagorawi atau Jalan Tol Cijago adalah jalan tol yang diresmikan tanggal 27 Januari 2012 lalu. Panjang jalan tol ini adalah 14,64 kilometer. Nantinya, tol Cijago ini akan berujung sampai ke Cinere, Depok dan bus kota dan jarak jauh atau menengah dari Terminal Depok akan melintasi jalan tol Jagorawi tanpa melewati Lenteng Agung dan Pasar Minggu dan juga bagi kendaran umum dan pribadi maupun Bus Bandara yang akan menuju Bandar Udara Internasional Soekarno–Hatta tanpa harus melewati Tol JORR 1 mapun Tol Dalam Kota Jakarta. Jalan Tol Cinere-Jagorawi yang beroperasi adalah Seksi 1 Ruas Jagorawi/Junction Cimanggis - Cisalak diresmikan tahun 2012 dan Seksi 2 Ruas Cisalak - Kukusan yang diresmikan tahun 2019. Sedangkan Seksi 3 Ruas Kukusan - Cinere sedang dalam Tahap Konstruksi setelah dimulainya Groundbreaking pada tanggal 28 Mei 2021 dan ditargetkan selesai pada akhir tahun 2022 dan beroperasi secara penuh pada tahun 2023 mendatang. Jalan tol ini merupakan bagian dari Jalan Tol Lingkar Luar Jakarta 2 atau JORR 2 (in)
dbo:city
dbo:highwaySystem
dbo:length
  • 14640.000000 (xsd:double)
dbo:routeEnd
dbo:routeEndDirection
  • East
dbo:routeJunction
dbo:routeStartDirection
  • West
dbo:routeTypeAbbreviation
  • Toll
dbo:thumbnail
dbo:wikiPageID
  • 58514836 (xsd:integer)
dbo:wikiPageLength
  • 4793 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1121018871 (xsd:integer)
dbo:wikiPageWikiLink
dbp:cities
dbp:col
  • 8 (xsd:integer)
dbp:country
  • IDN (en)
dbp:directionA
  • West (en)
dbp:directionB
  • East (en)
dbp:exit
  • 15 (xsd:integer)
dbp:formed
  • 2012 (xsd:integer)
dbp:junction
dbp:keys
  • etc,trans,unbuilt (en)
dbp:km
  • 15.200000 (xsd:double)
dbp:lengthKm
  • 14.640000 (xsd:double)
dbp:locationSpecial
dbp:lspan
  • 2 (xsd:integer)
dbp:maint
  • PT Translingkar Kita Jaya (en)
dbp:name
  • Cijago (en)
  • Cinere-Jagorawi Toll Road (en)
  • Kukusan Toll Gate (en)
dbp:notes
  • (en)
  • West-bound exit (en)
  • East-bound entry only, awaiting the completion of section 3 (en)
dbp:place
  • 24 (xsd:integer)
dbp:road
dbp:sspan
  • 7 (xsd:integer)
dbp:stateSpecial
dbp:system
dbp:terminusA
  • Limo Interchange (en)
dbp:terminusB
  • Cimanggis Interchange (en)
dbp:type
  • incomplete (en)
  • Toll (en)
  • unbuilt (en)
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • Cinere–Jagorawi Toll Road or Cijago Toll Road is a 14.64-kilometre (14.64 km) toll road which extends from Cimanggis to Cinere in West Java, Indonesia. This toll road is part of the Jakarta Outer Ring Road 2. The toll road is connected to Jagorawi Toll Road, Depok-Antasari Toll Road and Cinere-Serpong Toll Road. Section 1 from Cisalak to Jagorawi was inaugurated on January 27, 2012, which is 3.7 kilometres (2.3 mi) in length. The toll road is expected to be completed by the end of 2018. Metro and long distance and long or medium distances from Depok can use this toll road, without passing Lenteng Agung and Pasar Minggu. (en)
  • Jalan Tol Cinere-Jagorawi atau Jalan Tol Cijago adalah jalan tol yang diresmikan tanggal 27 Januari 2012 lalu. Panjang jalan tol ini adalah 14,64 kilometer. Nantinya, tol Cijago ini akan berujung sampai ke Cinere, Depok dan bus kota dan jarak jauh atau menengah dari Terminal Depok akan melintasi jalan tol Jagorawi tanpa melewati Lenteng Agung dan Pasar Minggu dan juga bagi kendaran umum dan pribadi maupun Bus Bandara yang akan menuju Bandar Udara Internasional Soekarno–Hatta tanpa harus melewati Tol JORR 1 mapun Tol Dalam Kota Jakarta. Jalan Tol Cinere-Jagorawi yang beroperasi adalah Seksi 1 Ruas Jagorawi/Junction Cimanggis - Cisalak diresmikan tahun 2012 dan Seksi 2 Ruas Cisalak - Kukusan yang diresmikan tahun 2019. Sedangkan Seksi 3 Ruas Kukusan - Cinere sedang dalam Tahap Konstruksi set (in)
rdfs:label
  • Cinere–Jagorawi Toll Road (en)
  • Jalan Tol Cinere–Jagorawi (in)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Cijago (en)
  • Cinere-Jagorawi Toll Road (en)
is dbo:routeJunction of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is dbp:junction of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License