Cattle Hill Wind Farm is a wind farm project developed and constructed by Goldwind Australia, in Tasmania. The site is located on the eastern shore of Lake Echo on the southern side of the Central Plateau of Tasmania and connects into TasNetworks's transmission network at the adjacent Waddamana Substation. The facility began construction in 2018 and was completed in 2020 with the installation of 48 Goldwind GW140 3MW turbines, each standing at 170m tall. The wind farm's output of 144MW is equivalent to the consumption of approximately 63,000 homes.

Property Value
dbo:abstract
  • Cattle Hill Wind Farm is a wind farm project developed and constructed by Goldwind Australia, in Tasmania. The site is located on the eastern shore of Lake Echo on the southern side of the Central Plateau of Tasmania and connects into TasNetworks's transmission network at the adjacent Waddamana Substation. The facility began construction in 2018 and was completed in 2020 with the installation of 48 Goldwind GW140 3MW turbines, each standing at 170m tall. The wind farm's output of 144MW is equivalent to the consumption of approximately 63,000 homes. (en)
dbo:averageAnnualGeneration
  • 1743120000000000.000000 (xsd:double)
dbo:buildingStartDate
  • 2018
dbo:buildingStartYear
  • 2018-01-01 (xsd:gYear)
dbo:capacityFactor
  • 37.240002 (xsd:float)
dbo:installedCapacity
  • 148400000.000000 (xsd:double)
dbo:openingYear
  • 2020-01-01 (xsd:gYear)
dbo:operator
dbo:status
  • O
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 60042705 (xsd:integer)
dbo:wikiPageLength
  • 3683 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1091949784 (xsd:integer)
dbo:wikiPageWikiLink
dbp:commissioned
  • 2020 (xsd:integer)
dbp:constructionBegan
  • 2018 (xsd:integer)
dbp:cost
  • 18000.0
dbp:country
  • Australia (en)
dbp:name
  • Cattle Hill Wind Farm (en)
dbp:operator
dbp:psAnnualGeneration
  • 484.2
dbp:psElectricalCapFac
  • 37.24
dbp:psElectricalCapacity
  • 148.4
dbp:psUnitsManuModel
  • Goldwind GW140 3S (en)
dbp:psUnitsOperational
  • 22 (xsd:integer)
  • 26 (xsd:integer)
dbp:status
  • O (en)
dbp:website
dbp:wikiPageUsesTemplate
dbp:windFarmType
  • Onshore (en)
dcterms:subject
georss:point
  • -42.151 146.688
rdf:type
rdfs:comment
  • Cattle Hill Wind Farm is a wind farm project developed and constructed by Goldwind Australia, in Tasmania. The site is located on the eastern shore of Lake Echo on the southern side of the Central Plateau of Tasmania and connects into TasNetworks's transmission network at the adjacent Waddamana Substation. The facility began construction in 2018 and was completed in 2020 with the installation of 48 Goldwind GW140 3MW turbines, each standing at 170m tall. The wind farm's output of 144MW is equivalent to the consumption of approximately 63,000 homes. (en)
rdfs:label
  • Cattle Hill Wind Farm (en)
owl:sameAs
geo:geometry
  • POINT(146.68800354004 -42.151000976562)
geo:lat
  • -42.151001 (xsd:float)
geo:long
  • 146.688004 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:homepage
foaf:isPrimaryTopicOf
foaf:name
  • Cattle Hill Wind Farm (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License