The Catalina Solar Project is a 143.2 megawatt (MW) photovoltaic power station located near Bakersfield, Kern County, California, owned by enXco, an EDF Énergies Nouvelles Company. It covers area of 445 hectares (1,100 acres). Construction began in May, 2012 and was fully completed in August, 2013. It use thin-film PV panels bought from Solar Frontier (CIGS type) and First Solar (CdTe type). Phase 1 had a nameplate capacity of 60 MW and was connected to the grid in December, 2012. That clean electricity could offset roughly 74,000 tons of carbon emissions each year.

Property Value
dbo:abstract
  • The Catalina Solar Project is a 143.2 megawatt (MW) photovoltaic power station located near Bakersfield, Kern County, California, owned by enXco, an EDF Énergies Nouvelles Company. It covers area of 445 hectares (1,100 acres). Construction began in May, 2012 and was fully completed in August, 2013. It use thin-film PV panels bought from Solar Frontier (CIGS type) and First Solar (CdTe type). Phase 1 had a nameplate capacity of 60 MW and was connected to the grid in December, 2012. enXco has signed a 25-year Power Purchase Agreement (PPA) with San Diego Gas & Electric (SDG&E) for the production from the station. That clean electricity could offset roughly 74,000 tons of carbon emissions each year. (en)
  • Le projet solaire Catalina est une centrale solaire photovoltaïque géante, d'une puissance crête de 143,2 MWc, située dans le désert des Mojaves, au sud-ouest des monts Tehachapi (comté de Kern, Californie). En construction depuis mai 2012, elle est complètement opérationnelle seulement une quinzaine de mois plus tard, en août 2013. (fr)
  • Catalina Solar — фотоэлектрическая станция общей мощностью 143 МВт. Расположена в округе Керн, штат Калифорния, США. Построена французской корпорацией на участке 4,4 квадратных километра частной земли. Строительство электростанции началось в мае 2012 года и было полностью завершено в августе 2013 года. Catalina Solar поставляет электричество потребителям с декабря 2012 года. Для производства электричества станция использует тонкослойные фотоэлектрические модули, произведенные компаниями и First Solar. Catalina Solar наряду с другими проектами возобновляемой энергии построена в рамках цели штата Калифорния — обеспечить получение 33 % потребляемой электроэнергии из возобновляемых источников к 2020 году. (ru)
dbo:buildingStartDate
  • May 2012
dbo:buildingStartYear
  • 2012-01-01 (xsd:gYear)
dbo:installedCapacity
  • 143200000.000000 (xsd:double)
dbo:location
dbo:openingYear
  • 2012-01-01 (xsd:gYear)
  • 2013-01-01 (xsd:gYear)
dbo:status
  • o
dbo:wikiPageID
  • 37778891 (xsd:integer)
dbo:wikiPageLength
  • 4295 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1101114691 (xsd:integer)
dbo:wikiPageWikiLink
dbp:commissioned
  • Phase 1: December 2012, (en)
  • phase 2: August 2013 (en)
dbp:constructionBegan
  • May 2012 (en)
dbp:country
  • United States (en)
dbp:location
dbp:name
  • Catalina Solar Project (en)
dbp:operator
  • enXco (en)
dbp:owner
  • enXco (en)
dbp:psElectricalCapacity
  • 143.2
dbp:psUnitsOperational
  • >1.1 million (en)
dbp:solarType
  • PV (en)
dbp:status
  • o (en)
dbp:wikiPageUsesTemplate
dcterms:subject
georss:point
  • 34.93083333333333 -118.335
rdf:type
rdfs:comment
  • Le projet solaire Catalina est une centrale solaire photovoltaïque géante, d'une puissance crête de 143,2 MWc, située dans le désert des Mojaves, au sud-ouest des monts Tehachapi (comté de Kern, Californie). En construction depuis mai 2012, elle est complètement opérationnelle seulement une quinzaine de mois plus tard, en août 2013. (fr)
  • The Catalina Solar Project is a 143.2 megawatt (MW) photovoltaic power station located near Bakersfield, Kern County, California, owned by enXco, an EDF Énergies Nouvelles Company. It covers area of 445 hectares (1,100 acres). Construction began in May, 2012 and was fully completed in August, 2013. It use thin-film PV panels bought from Solar Frontier (CIGS type) and First Solar (CdTe type). Phase 1 had a nameplate capacity of 60 MW and was connected to the grid in December, 2012. That clean electricity could offset roughly 74,000 tons of carbon emissions each year. (en)
  • Catalina Solar — фотоэлектрическая станция общей мощностью 143 МВт. Расположена в округе Керн, штат Калифорния, США. Построена французской корпорацией на участке 4,4 квадратных километра частной земли. Строительство электростанции началось в мае 2012 года и было полностью завершено в августе 2013 года. Catalina Solar поставляет электричество потребителям с декабря 2012 года. Для производства электричества станция использует тонкослойные фотоэлектрические модули, произведенные компаниями и First Solar. (ru)
rdfs:label
  • Catalina Solar Project (en)
  • Projet solaire Catalina (fr)
  • Catalina Solar (ru)
owl:sameAs
geo:geometry
  • POINT(-118.33499908447 34.93083190918)
geo:lat
  • 34.930832 (xsd:float)
geo:long
  • -118.334999 (xsd:float)
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • Catalina Solar Project (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License