An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Búðarháls hydroelectric power plant (Icelandic: Búðarhálsstöð [ˈpuːðarˌhaulsˌstœːθ]) is the seventh largest power station of Landsvirkjun, the Icelandic national power company. It is located in the south of Iceland, around 150 km to the east of Reykjavík, in the Þjórsá and Tungnaá water catchment area, near the junction of the Kaldakvísl and Tungnaá rivers. It was officially opened on 7 March 2014.

Property Value
dbo:Infrastructure/length
  • 0.17
dbo:abstract
  • Búðarháls hydroelectric power plant (Icelandic: Búðarhálsstöð [ˈpuːðarˌhaulsˌstœːθ]) is the seventh largest power station of Landsvirkjun, the Icelandic national power company. It is located in the south of Iceland, around 150 km to the east of Reykjavík, in the Þjórsá and Tungnaá water catchment area, near the junction of the Kaldakvísl and Tungnaá rivers. It was officially opened on 7 March 2014. This power plant is the newest of six hydroelectric plants (the others being Búrfell, Sultartangi, Hrauneyjafoss, Vatnsfell and Sigalda) in the Þjórsá-Tungnaá area, and it is able to produce 585 GWh annually with its installed capacity of 95 MW (2 x 47.5 MW). The created reservoir, Sporðalda in the southeast of the mountain, with a surface of 7 km² and a total capacity of 50 hm³, is backed up by two embankment dams. The Búðarháls power station is very important to the development of Iceland´s hydropower plants, since it connects all power plants on this river, which allows Iceland to use the whole river from top to bottom to its fullest, in order to make it unnecessary to destroy and dam other rivers instead. (en)
  • ГЕС Búðarháls – гідроелектростанція на південному заході Ісландії. Входить до складу каскаду у сточищі річки Тйоурсау (Þjórsá), в якому знаходиться між ГЕС Hrauneyjafoss (на лівій притоці Тйоурсау річці ) та ГЕС Sultartangi (розташована вже на самій Тйоурсау). До появи станції Búðarháls, введеної в експлуатацію у 2014 році, відпрацьована на Hrauneyjafoss вода скидалась у природне русло Тунґнаа, при цьому до водосховища Sultartangalón ще залишався перепад висот 40 метрів. Для використання останнього відвідний канал перекрили кам’яно-накидною греблю висотою 25 метрів та довжиною 170 метрів. Через сотню метрів північніше починається друга гребля такої ж висоти, проте значно більшої довжини – 1100 метрів. Вона перегороджує долину правої притоки Тунґнаа річки Kaldakvísl, основний ресурс з якої раніше вже був штучно спрямований через дериваційну систему до Тунґнаа, проте провадиться перепуск певної частини води до старого русла. Ці дві споруди утворюють водосховище Sporðalda із площею поверхні 7 км2, яке займає переважно долину Kaldakvísl. Звідси прокладено тунель довжиною 4 км, що досягає східного берега водосховища Sultartangalón, де розташований машинний зал. Останній обладнаний двома турбінами типу Каплан потужністю по 47,5 МВт, які забезпечують виробництво 585 млн кВт-год електроенергії на рік. (uk)
dbo:country
dbo:description
  • Embankment, two rock-fill dams (en)
dbo:height
  • 25.000000 (xsd:double)
dbo:lake
dbo:length
  • 170.000000 (xsd:double)
dbo:openingDate
  • 2014-03-07 (xsd:date)
dbo:openingYear
  • 2014-01-01 (xsd:gYear)
dbo:part
dbo:status
  • Optional
dbo:volume
  • 25500.000000 (xsd:double)
  • 165000.000000 (xsd:double)
dbo:wikiPageID
  • 50883407 (xsd:integer)
dbo:wikiPageLength
  • 6623 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1106308408 (xsd:integer)
dbo:wikiPageWikiLink
dbp:country
dbp:damCrosses
  • Kaldakvísl River (en)
  • Tungnaá River (en)
dbp:damType
  • Embankment, two rock-fill dams (en)
dbp:name
  • Búðarháls Hydropower Plant (en)
dbp:opening
  • 2014-03-07 (xsd:date)
dbp:plantAnnualGen
  • 585.0
dbp:plantCapacity
  • 95.0
dbp:plantOperator
dbp:plantTurbines
  • 2 (xsd:integer)
dbp:resName
  • Sporðalda Reservoir (en)
dbp:spillwayCount
  • 1 (xsd:integer)
dbp:spillwayType
  • Headrace tunnel, penstock (en)
dbp:status
  • Optional (en)
dbp:wikiPageUsesTemplate
dcterms:subject
georss:point
  • 64.23527777777778 -19.369166666666665
rdf:type
rdfs:comment
  • Búðarháls hydroelectric power plant (Icelandic: Búðarhálsstöð [ˈpuːðarˌhaulsˌstœːθ]) is the seventh largest power station of Landsvirkjun, the Icelandic national power company. It is located in the south of Iceland, around 150 km to the east of Reykjavík, in the Þjórsá and Tungnaá water catchment area, near the junction of the Kaldakvísl and Tungnaá rivers. It was officially opened on 7 March 2014. (en)
  • ГЕС Búðarháls – гідроелектростанція на південному заході Ісландії. Входить до складу каскаду у сточищі річки Тйоурсау (Þjórsá), в якому знаходиться між ГЕС Hrauneyjafoss (на лівій притоці Тйоурсау річці ) та ГЕС Sultartangi (розташована вже на самій Тйоурсау). Звідси прокладено тунель довжиною 4 км, що досягає східного берега водосховища Sultartangalón, де розташований машинний зал. Останній обладнаний двома турбінами типу Каплан потужністю по 47,5 МВт, які забезпечують виробництво 585 млн кВт-год електроенергії на рік. (uk)
rdfs:label
  • Búðarháls Power Plant (en)
  • ГЕС Búðarháls (uk)
owl:sameAs
geo:geometry
  • POINT(-19.369167327881 64.235275268555)
geo:lat
  • 64.235275 (xsd:float)
geo:long
  • -19.369167 (xsd:float)
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • Búðarháls Hydropower Plant (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License