An Entity of Type: software, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Beck tunnel boring machine (alternately Big Becky) was the largest tunnel boring machine in the world, when it was operated by Ontario Power Generation, from 2006 to 2011. Hydro used it to bore a deep replacement tunnel to supply water from the upper Niagara River 10.2 kilometres (6.3 mi) to the Sir Adam Beck Hydroelectric Plant. The tunnel it bored was 14.4 metres (47 ft) in diameter. The tunnel was delayed when Beck encountered a bed of loose material, unsuitable for boring, that required a detour.

Property Value
dbo:abstract
  • The Beck tunnel boring machine (alternately Big Becky) was the largest tunnel boring machine in the world, when it was operated by Ontario Power Generation, from 2006 to 2011. Hydro used it to bore a deep replacement tunnel to supply water from the upper Niagara River 10.2 kilometres (6.3 mi) to the Sir Adam Beck Hydroelectric Plant. The tunnel it bored was 14.4 metres (47 ft) in diameter. The tunnel was delayed when Beck encountered a bed of loose material, unsuitable for boring, that required a detour. According to Ontario Power Generation the TBM itself weighed 2000 tons.However, when its task was complete, , the firm that removed Beck, described it weighing 7000 tons. (en)
dbo:wikiPageID
  • 49259192 (xsd:integer)
dbo:wikiPageLength
  • 2788 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1117240416 (xsd:integer)
dbo:wikiPageWikiLink
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
rdf:type
rdfs:comment
  • The Beck tunnel boring machine (alternately Big Becky) was the largest tunnel boring machine in the world, when it was operated by Ontario Power Generation, from 2006 to 2011. Hydro used it to bore a deep replacement tunnel to supply water from the upper Niagara River 10.2 kilometres (6.3 mi) to the Sir Adam Beck Hydroelectric Plant. The tunnel it bored was 14.4 metres (47 ft) in diameter. The tunnel was delayed when Beck encountered a bed of loose material, unsuitable for boring, that required a detour. (en)
rdfs:label
  • Beck tunnel boring machine (en)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License