The Bawanur Dam is an earth-fill dam currently being constructed on the Diyala River just upstream of the town of Bawanur in Sulaymaniyah Governorate, Iraq. The 23 m (75 ft) tall dam will support a 32 MW run-of-the-river hydroelectric power station. It will also serve to control floods and provide water for irrigation. In August 2013, the Kurdistan Regional Government signed a US$200 million contract with the Romanian firm, Hidroconstrucția, to build the dam and power station. The project is expected to be complete in 2018.
Property | Value |
---|---|
dbo:Infrastructure/length |
|
dbo:abstract |
|
dbo:buildingStartDate |
|
dbo:buildingStartYear |
|
dbo:description |
|
dbo:elevation |
|
dbo:height |
|
dbo:lake | |
dbo:length |
|
dbo:location | |
dbo:openingYear |
|
dbo:owner | |
dbo:part | |
dbo:purpose |
|
dbo:river | |
dbo:status |
|
dbo:volume |
|
dbo:wikiPageID |
|
dbo:wikiPageLength |
|
dbo:wikiPageRevisionID |
|
dbo:wikiPageWikiLink |
|
dbp:constructionBegan |
|
dbp:cost |
|
dbp:country |
|
dbp:damCrosses | |
dbp:damType |
|
dbp:location |
|
dbp:locationMap |
|
dbp:locationMapCaption |
|
dbp:name |
|
dbp:opening |
|
dbp:owner | |
dbp:plantCapacity |
|
dbp:plantCommission |
|
dbp:plantTurbines |
|
dbp:plantType |
|
dbp:purpose |
|
dbp:status |
|
dbp:wikiPageUsesTemplate | |
dcterms:subject | |
georss:point |
|
rdf:type | |
rdfs:comment |
|
rdfs:label |
|
owl:sameAs | |
geo:geometry |
|
geo:lat |
|
geo:long |
|
prov:wasDerivedFrom | |
foaf:isPrimaryTopicOf | |
foaf:name |
|
is dbo:wikiPageWikiLink of | |
is foaf:primaryTopic of |