About: Bawanur Dam

An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Bawanur Dam is an earth-fill dam currently being constructed on the Diyala River just upstream of the town of Bawanur in Sulaymaniyah Governorate, Iraq. The 23 m (75 ft) tall dam will support a 32 MW run-of-the-river hydroelectric power station. It will also serve to control floods and provide water for irrigation. In August 2013, the Kurdistan Regional Government signed a US$200 million contract with the Romanian firm, Hidroconstrucția, to build the dam and power station. The project is expected to be complete in 2018.

Property Value
dbo:Infrastructure/length
  • 1.19
dbo:abstract
  • The Bawanur Dam is an earth-fill dam currently being constructed on the Diyala River just upstream of the town of Bawanur in Sulaymaniyah Governorate, Iraq. The 23 m (75 ft) tall dam will support a 32 MW run-of-the-river hydroelectric power station. It will also serve to control floods and provide water for irrigation. In August 2013, the Kurdistan Regional Government signed a US$200 million contract with the Romanian firm, Hidroconstrucția, to build the dam and power station. The project is expected to be complete in 2018. (en)
dbo:buildingStartDate
  • 2013
dbo:buildingStartYear
  • 2013-01-01 (xsd:gYear)
dbo:description
  • Embankment, earth-fill (en)
dbo:elevation
  • 300.000000 (xsd:double)
dbo:height
  • 23.000000 (xsd:double)
dbo:lake
dbo:length
  • 1190.000000 (xsd:double)
dbo:location
dbo:openingYear
  • 2018-01-01 (xsd:gYear)
dbo:owner
dbo:part
dbo:purpose
  • Power, irrigation, flood control
dbo:river
dbo:status
  • UC
dbo:volume
  • 1108000.000000 (xsd:double)
dbo:wikiPageID
  • 50252437 (xsd:integer)
dbo:wikiPageLength
  • 3664 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 811377552 (xsd:integer)
dbo:wikiPageWikiLink
dbp:constructionBegan
  • 2013 (xsd:integer)
dbp:cost
  • 2.0E8
dbp:country
  • Iraq (en)
dbp:damCrosses
dbp:damType
  • Embankment, earth-fill (en)
dbp:location
  • Bawanur in Sulaymaniyah Governorate (en)
dbp:locationMap
  • Iraq#Iraqi Kurdistan (en)
dbp:locationMapCaption
  • Location of the Bawanur Dam (en)
dbp:name
  • Bawanur Dam (en)
dbp:opening
  • 2018 (xsd:integer)
dbp:owner
dbp:plantCapacity
  • 32.0
dbp:plantCommission
  • 2018 (xsd:integer)
dbp:plantTurbines
  • 4 (xsd:integer)
dbp:plantType
  • R (en)
dbp:purpose
  • Power, irrigation, flood control (en)
dbp:status
  • UC (en)
dbp:wikiPageUsesTemplate
dcterms:subject
georss:point
  • 34.841408333333334 45.530483333333336
rdf:type
rdfs:comment
  • The Bawanur Dam is an earth-fill dam currently being constructed on the Diyala River just upstream of the town of Bawanur in Sulaymaniyah Governorate, Iraq. The 23 m (75 ft) tall dam will support a 32 MW run-of-the-river hydroelectric power station. It will also serve to control floods and provide water for irrigation. In August 2013, the Kurdistan Regional Government signed a US$200 million contract with the Romanian firm, Hidroconstrucția, to build the dam and power station. The project is expected to be complete in 2018. (en)
rdfs:label
  • Bawanur Dam (en)
owl:sameAs
geo:geometry
  • POINT(45.53048324585 34.841407775879)
geo:lat
  • 34.841408 (xsd:float)
geo:long
  • 45.530483 (xsd:float)
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
foaf:name
  • Bawanur Dam (en)
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of