An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Aurora Solar Thermal Power Project was a planned solar power tower solar thermal power plant to be located north of Port Augusta in South Australia. It was planned to generate 150 MW of electricity after it was completed in 2020. Storage capacity would have been up to 8 hours at full power. The facility was expected to produce 495 GWh of electricity annually. It was to be 30 kilometres (19 mi) north of Port Augusta on Carriewerloo Station. On 5 April 2019, South Australian Energy Minister Dan van Holst Pellekaan announced the cancellation of the project.

Property Value
dbo:abstract
  • Aurora Solar Thermal Power Project was a planned solar power tower solar thermal power plant to be located north of Port Augusta in South Australia. It was planned to generate 150 MW of electricity after it was completed in 2020. Storage capacity would have been up to 8 hours at full power. The facility was expected to produce 495 GWh of electricity annually. It was to be 30 kilometres (19 mi) north of Port Augusta on Carriewerloo Station. On 5 April 2019, South Australian Energy Minister Dan van Holst Pellekaan announced the cancellation of the project. (en)
dbo:location
dbo:operator
dbo:status
  • P
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 54905554 (xsd:integer)
dbo:wikiPageLength
  • 9429 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1085149991 (xsd:integer)
dbo:wikiPageWikiLink
dbp:cost
  • (en)
  • AUD 650M (en)
dbp:country
  • Australia (en)
dbp:location
  • South Australia (en)
dbp:name
  • Aurora Solar Thermal Power Project (en)
dbp:operator
dbp:psAnnualGeneration
  • 495 (xsd:integer)
dbp:psElectricalCapacity
  • 70 (xsd:integer)
dbp:psStorageCapacity
  • 1200 (xsd:integer)
dbp:psUnitsCancelled
  • 1 (xsd:integer)
dbp:solarCspTechnology
  • T (en)
dbp:solarType
  • PV (en)
dbp:status
  • P (en)
dbp:website
dbp:wikiPageUsesTemplate
dct:subject
georss:point
  • -32.2 137.6
rdf:type
rdfs:comment
  • Aurora Solar Thermal Power Project was a planned solar power tower solar thermal power plant to be located north of Port Augusta in South Australia. It was planned to generate 150 MW of electricity after it was completed in 2020. Storage capacity would have been up to 8 hours at full power. The facility was expected to produce 495 GWh of electricity annually. It was to be 30 kilometres (19 mi) north of Port Augusta on Carriewerloo Station. On 5 April 2019, South Australian Energy Minister Dan van Holst Pellekaan announced the cancellation of the project. (en)
rdfs:label
  • Aurora Solar Thermal Power Project (en)
owl:sameAs
geo:geometry
  • POINT(137.60000610352 -32.200000762939)
geo:lat
  • -32.200001 (xsd:float)
geo:long
  • 137.600006 (xsd:float)
prov:wasDerivedFrom
foaf:homepage
foaf:isPrimaryTopicOf
foaf:name
  • Aurora Solar Thermal Power Project (en)
is dbo:wikiPageDisambiguates of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License