- The Techren Solar Project is a 400 megawatt (MWAC) solar photovoltaic power plant near Boulder City, Nevada. Electricity production began with completion of the two building phases in 2019–2020. The project is co-located with several other large solar power projects in the Eldorado Valley. (en)
|
dbo:buildingStartDate
| |
dbo:buildingStartYear
|
- 2017-01-01 (xsd:gYear)
- 2018-01-01 (xsd:gYear)
|
dbo:location
| |
dbo:openingYear
| |
dbo:operator
| |
dbo:status
| |
dbo:thumbnail
| |
dbo:wikiPageExternalLink
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 7494 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbp:commissioned
|
- September 2019 (en)
- March 2019 (en)
|
dbp:constructionBegan
|
- 2017 (xsd:integer)
- 2018 (xsd:integer)
|
dbp:country
| |
dbp:location
| |
dbp:name
|
- Techren Solar Project (en)
|
dbp:operator
|
- Swinerton Renewable Energy (en)
|
dbp:psElectricalCapacity
| |
dbp:solarType
| |
dbp:status
| |
dbp:wikiPageUsesTemplate
| |
dcterms:subject
| |
georss:point
|
- 35.78333333333333 -115.01666666666667
|
rdf:type
| |
rdfs:comment
|
- The Techren Solar Project is a 400 megawatt (MWAC) solar photovoltaic power plant near Boulder City, Nevada. Electricity production began with completion of the two building phases in 2019–2020. The project is co-located with several other large solar power projects in the Eldorado Valley. (en)
|
rdfs:label
|
- Techren Solar Project (en)
|
owl:sameAs
| |
geo:geometry
|
- POINT(-115.01667022705 35.783332824707)
|
geo:lat
| |
geo:long
| |
prov:wasDerivedFrom
| |
foaf:depiction
| |
foaf:isPrimaryTopicOf
| |
foaf:name
|
- Techren Solar Project (en)
|
is dbo:wikiPageWikiLink
of | |
is foaf:primaryTopic
of | |