An Entity of Type: Rapid transit, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Line 8 of the Shenzhen Metro (also known as the Yantian line) is an East-West line from Liantang to Yantian Road. It opened on 28 October 2020. Line 8 has a length of 12.367 km (7.7 mi) and a total of 7 stations. Line 8 is the first line to serve Yantian District. Line 8 merges into Line 2 at Liantang station, with trains on Line 8 continuing service to Chiwan station.

Property Value
dbo:abstract
  • Line 8 of the Shenzhen Metro (also known as the Yantian line) is an East-West line from Liantang to Yantian Road. It opened on 28 October 2020. Line 8 has a length of 12.367 km (7.7 mi) and a total of 7 stations. Line 8 is the first line to serve Yantian District. Line 8 merges into Line 2 at Liantang station, with trains on Line 8 continuing service to Chiwan station. (en)
  • 深圳地下鉄8号線(しんせんちかてつ8ごうせん、中文表記: 深圳地铁8号线、英文表記: Shenzhen Metro Line 8)は中華人民共和国広東省深圳市で建設中の深圳地下鉄の路線。計画段階では塩田線(えんでんせん)と称された。 (ja)
  • 深圳地铁8号线,曾稱鹽田線,是深圳地铁的一条路线,为连接中心城区和盐田区的局域线,主要聯繫羅湖中心區與蓮塘、沙頭角、鹽田港、大梅沙、小梅沙等片區。 8号线属深圳市轨道交通中较早期规划的路线之一,更被纳入在2011年获审批的地铁三期工程,但在客流及轨道交通​​制式上存在极大争议,工程多次修改及延迟,最终更改为与2号线直通运行,并于2015年尾开始动工。 本线的代表色为粉红色,但为方便乘客了解本线与2号线的直通运行关系,在路线图及车站标识上由与2号线相同的橙色表示,而在列车等地方则继续以粉红色表示。 2020年9月28日,8号线一期通过竣工验收,于2020年10月28日开通运营。 (zh)
dbo:isPartOf
dbo:lineLength
  • 12367.000000 (xsd:double)
dbo:location
dbo:numberOfStations
  • 7 (xsd:nonNegativeInteger)
dbo:openingDate
  • 2020-10-28 (xsd:date)
dbo:openingYear
  • 2020-01-01 (xsd:gYear)
dbo:railwayRollingStock
dbo:routeEnd
dbo:routeStart
dbo:status
  • Operational
dbo:thumbnail
dbo:type
dbo:wikiPageID
  • 41718440 (xsd:integer)
dbo:wikiPageLength
  • 12329 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1124275023 (xsd:integer)
dbo:wikiPageWikiLink
dbp:caption
dbp:character
  • Underground (en)
dbp:depot
  • Wangji Lake stabling yard (en)
dbp:end
dbp:locale
dbp:logo
  • ShenzhenMetroLine8.svg (en)
dbp:logoWidth
  • 100 (xsd:integer)
dbp:mapState
  • collapsed (en)
dbp:open
  • 2020-10-28 (xsd:date)
dbp:operator
  • SZMC (en)
dbp:start
dbp:stations
  • 7 (xsd:integer)
dbp:status
  • Operational (en)
dbp:stock
  • CRRC Zhuzhou (en)
  • Trains service in Line 2 (en)
dbp:system
dbp:tracks
  • 2 (xsd:integer)
dbp:type
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • Line 8 of the Shenzhen Metro (also known as the Yantian line) is an East-West line from Liantang to Yantian Road. It opened on 28 October 2020. Line 8 has a length of 12.367 km (7.7 mi) and a total of 7 stations. Line 8 is the first line to serve Yantian District. Line 8 merges into Line 2 at Liantang station, with trains on Line 8 continuing service to Chiwan station. (en)
  • 深圳地下鉄8号線(しんせんちかてつ8ごうせん、中文表記: 深圳地铁8号线、英文表記: Shenzhen Metro Line 8)は中華人民共和国広東省深圳市で建設中の深圳地下鉄の路線。計画段階では塩田線(えんでんせん)と称された。 (ja)
  • 深圳地铁8号线,曾稱鹽田線,是深圳地铁的一条路线,为连接中心城区和盐田区的局域线,主要聯繫羅湖中心區與蓮塘、沙頭角、鹽田港、大梅沙、小梅沙等片區。 8号线属深圳市轨道交通中较早期规划的路线之一,更被纳入在2011年获审批的地铁三期工程,但在客流及轨道交通​​制式上存在极大争议,工程多次修改及延迟,最终更改为与2号线直通运行,并于2015年尾开始动工。 本线的代表色为粉红色,但为方便乘客了解本线与2号线的直通运行关系,在路线图及车站标识上由与2号线相同的橙色表示,而在列车等地方则继续以粉红色表示。 2020年9月28日,8号线一期通过竣工验收,于2020年10月28日开通运营。 (zh)
rdfs:label
  • Line 8 (Shenzhen Metro) (en)
  • 深圳地下鉄8号線 (ja)
  • 深圳地铁8号线 (zh)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License