An Entity of Type: Rapid transit, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Line 18 of the Chengdu Metro (simplified Chinese: 成都地铁18号线; traditional Chinese: 成都地鐵18號線; pinyin: Chéngdū Dìtiě Shíbā Hào Xiàn) is an express rapid transit line that connects the urban area of Chengdu with Chengdu Tianfu International Airport. Line 18's color is teal. The Phase 1 & 2 of Line 18 is in total 69.39 km in length. It is also the biggest PPP project in China. The section from South Railway Station to Tianfu International Airport North Station started operation on 18 December 2020.

Property Value
dbo:abstract
  • Line 18 of the Chengdu Metro (simplified Chinese: 成都地铁18号线; traditional Chinese: 成都地鐵18號線; pinyin: Chéngdū Dìtiě Shíbā Hào Xiàn) is an express rapid transit line that connects the urban area of Chengdu with Chengdu Tianfu International Airport. Line 18's color is teal. The Phase 1 & 2 of Line 18 is in total 69.39 km in length. It is also the biggest PPP project in China. The section from South Railway Station to Tianfu International Airport North Station started operation on 18 December 2020. Between Chengdu South Railway Station and Western China International Expo City Station, the line runs adjacent to Line 1 essentially forming a four track subway. Line 18 runs express between the two stations, skipping a number of stops that Line 1 makes. The four track alignment with Line 1 will be extended to North Railway Station once Phase 3 of the line is completed. (en)
  • 成都地下鉄18号線 (せいとちかてつ18ごうせん、中文表記: 成都地铁18号线、英文表記: Chengdu Metro Line 18)は、中華人民共和国四川省成都市と成都天府国際空港を結ぶ成都軌道交通の路線。 (ja)
  • 成都地铁18号线是位于四川省成都市,隶属于成都地铁的一条的快速地铁线,线路代表色为深青色,是连接中心城区和成都天府国际机场、简阳市的快线,一、二期工程大部分车站于2020年启用,天府机场1号2号航站楼站于2021年随天府机场开通启用,三期工程预计2024年启用。 (zh)
dbo:isPartOf
dbo:lineLength
  • 69390.000000 (xsd:double)
dbo:location
dbo:numberOfStations
  • 9 (xsd:nonNegativeInteger)
  • 17 (xsd:nonNegativeInteger)
dbo:openingDate
  • 2020-09-27 (xsd:date)
dbo:openingYear
  • 2020-01-01 (xsd:gYear)
dbo:operator
dbo:speedLimit
  • 140.000000 (xsd:double)
dbo:status
  • In operation
dbo:thumbnail
dbo:type
dbo:wikiPageID
  • 51128180 (xsd:integer)
dbo:wikiPageLength
  • 16520 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1124868328 (xsd:integer)
dbo:wikiPageWikiLink
dbp:electrification
  • AC 25 kV, Overhead line (en)
dbp:locale
dbp:mapState
  • collapsed (en)
dbp:open
  • 2020-09-27 (xsd:date)
dbp:operator
dbp:owner
dbp:p
  • Chéngdū Dìtiě Shíbā Hào Xiàn (en)
dbp:s
  • 成都地铁18号线 (en)
dbp:speed
  • 140.0
dbp:stations
  • 9 (xsd:integer)
  • 17 (xsd:integer)
dbp:status
  • In operation (en)
dbp:stock
  • 8 (xsd:integer)
dbp:system
dbp:t
  • 成都地鐵18號線 (en)
dbp:tracks
  • 2 (xsd:integer)
dbp:type
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • 成都地下鉄18号線 (せいとちかてつ18ごうせん、中文表記: 成都地铁18号线、英文表記: Chengdu Metro Line 18)は、中華人民共和国四川省成都市と成都天府国際空港を結ぶ成都軌道交通の路線。 (ja)
  • 成都地铁18号线是位于四川省成都市,隶属于成都地铁的一条的快速地铁线,线路代表色为深青色,是连接中心城区和成都天府国际机场、简阳市的快线,一、二期工程大部分车站于2020年启用,天府机场1号2号航站楼站于2021年随天府机场开通启用,三期工程预计2024年启用。 (zh)
  • Line 18 of the Chengdu Metro (simplified Chinese: 成都地铁18号线; traditional Chinese: 成都地鐵18號線; pinyin: Chéngdū Dìtiě Shíbā Hào Xiàn) is an express rapid transit line that connects the urban area of Chengdu with Chengdu Tianfu International Airport. Line 18's color is teal. The Phase 1 & 2 of Line 18 is in total 69.39 km in length. It is also the biggest PPP project in China. The section from South Railway Station to Tianfu International Airport North Station started operation on 18 December 2020. (en)
rdfs:label
  • Line 18 (Chengdu Metro) (en)
  • 成都地下鉄18号線 (ja)
  • 成都地铁18号线 (zh)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License