Lempster Mountain Wind Power Project is a 24-megawatt wind farm, opened in 2008 in Lempster, New Hampshire in the northeast United States. Owned by Iberdrola, it is the first major wind-power installation in the state of New Hampshire. Located 5 miles from Mount Sunapee, it has 12 wind turbines stretching over several connected ridgelines. * Wind turbine tower * Lempster Wind Farm
Property | Value |
---|---|
dbo:abstract |
|
dbo:thumbnail | |
dbo:wikiPageExternalLink | |
dbo:wikiPageID |
|
dbo:wikiPageLength |
|
dbo:wikiPageRevisionID |
|
dbo:wikiPageWikiLink |
|
dbp:wikiPageUsesTemplate | |
dcterms:subject | |
gold:hypernym | |
georss:point |
|
rdf:type |
|
rdfs:comment |
|
rdfs:label |
|
owl:sameAs | |
geo:geometry |
|
geo:lat |
|
geo:long |
|
prov:wasDerivedFrom | |
foaf:depiction | |
foaf:isPrimaryTopicOf | |
is dbo:wikiPageRedirects of | |
is dbo:wikiPageWikiLink of | |
is foaf:primaryTopic of |