an Entity references as follows:
The Tokyo Aquatics Centre (東京アクアティクスセンター, Tōkyō akuatikusu sentā) is an indoor swimming pool in the Mori- Beach Park (辰巳の森海浜公園) in Tatsumi in the Kōtō ward in eastern Tokyo. Construction began in April 2017 and was completed in 2020. The total construction cost was 56.7 billion ¥ (471 million €). The opening, scheduled for 22 March 2020, was postponed due to the COVID-19 pandemic and took place on 23 July 2020 without an audience.