About: Whittenton Pond Dam     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Whole100003553, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FWhittenton_Pond_Dam

Whittenton Pond Dam or Whittenton Street Dam was a private earthen dam across the Mill River in Taunton, Massachusetts. Built in 1832, the original dam was a half-mile upstream from downtown Taunton. It was 12 feet high and constructed of timber. It was built of wood in 1832, and flooded Taunton when it failed in 1968. The dam was purchased during the summer of 2005 by Infinity Holdings, a real-estate development company in the Boston area. In 2008, the Whittenton Pond Dam was part of a study by the Massachusetts Riverways Program to review the feasibility of dam removals along the Mill River.

AttributesValues
rdf:type
rdfs:label
  • Whittenton Pond Dam (en)
rdfs:comment
  • Whittenton Pond Dam or Whittenton Street Dam was a private earthen dam across the Mill River in Taunton, Massachusetts. Built in 1832, the original dam was a half-mile upstream from downtown Taunton. It was 12 feet high and constructed of timber. It was built of wood in 1832, and flooded Taunton when it failed in 1968. The dam was purchased during the summer of 2005 by Infinity Holdings, a real-estate development company in the Boston area. In 2008, the Whittenton Pond Dam was part of a study by the Massachusetts Riverways Program to review the feasibility of dam removals along the Mill River. (en)
geo:lat
geo:long
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
georss:point
  • 41.9243 -71.1065
has abstract
  • Whittenton Pond Dam or Whittenton Street Dam was a private earthen dam across the Mill River in Taunton, Massachusetts. Built in 1832, the original dam was a half-mile upstream from downtown Taunton. It was 12 feet high and constructed of timber. It was built of wood in 1832, and flooded Taunton when it failed in 1968. The dam was purchased during the summer of 2005 by Infinity Holdings, a real-estate development company in the Boston area. Historically heavy and protracted rains fell on New England beginning October 12, 2005. On the morning of Sunday, October 16, officials realized that the dam was in trouble. The dam was determined to be in imminent danger of failure and of flooding Taunton with a 6-foot (1.8 m) wall of water. On Tuesday, 2000 residents of the city were evacuated and twenty-one troops from the National Guard were stationed in Taunton. School in Taunton was cancelled, and several roads were closed. Several high-volume pumps were employed to divert water around the dam and drain Whittenton Pond before a catastrophic failure could occur. Though the wooden dam held, later inspections uncovered extensive structural damage. (The Commonwealth of Massachusetts had last inspected the dam for safety and structural integrity in 2003.) After Whittenton Pond was drained, the old dam was demolished, and a new compressed earth and rock dam was built in its place. In 2008, the Whittenton Pond Dam was part of a study by the Massachusetts Riverways Program to review the feasibility of dam removals along the Mill River. The dam was permanently removed in 2013. (en)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-71.106498718262 41.924301147461)
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (62 GB total memory, 54 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software