The unit commitment problem (UC) in electrical power production is a large family of mathematical optimization problems where the production of a set of electrical generators is coordinated in order to achieve some common target, usually either matching the energy demand at minimum cost or maximizing revenue from electricity production. This is necessary because it is difficult to store electrical energy on a scale comparable with normal consumption; hence, each (substantial) variation in the consumption must be matched by a corresponding variation of the production.

AttributesValues
rdfs:label
  • Kraftwerkseinsatzoptimierung (de)
  • Unit commitment problem in electrical power production (en)
rdfs:comment
  • Als Kraftwerkseinsatzoptimierung bezeichnet man die Bestimmung der wirtschaftlich optimalen Fahrweise eines Kraftwerks. Restriktionen wie Take-or-Pay-Verträge und Fernwärmeversorgungspflichten können dazu führen, dass das Kraftwerk fahren muss, obwohl hierdurch ein negatives Ergebnis erzielt wird. In diesem Fall bestimmt die Einsatzoptimierung die Fahrweise, die den Verlust minimiert. Im Allgemeinen bestimmt die Einsatzoptimierung den wirtschaftlich vorteilhaftesten Fahrplan, der alle technischen und vertraglichen Restriktionen, die mit dem Kraftwerksbetrieb verbunden sind, erfüllt. (de)
  • The unit commitment problem (UC) in electrical power production is a large family of mathematical optimization problems where the production of a set of electrical generators is coordinated in order to achieve some common target, usually either matching the energy demand at minimum cost or maximizing revenue from electricity production. This is necessary because it is difficult to store electrical energy on a scale comparable with normal consumption; hence, each (substantial) variation in the consumption must be matched by a corresponding variation of the production. (en)
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
has abstract
  • Als Kraftwerkseinsatzoptimierung bezeichnet man die Bestimmung der wirtschaftlich optimalen Fahrweise eines Kraftwerks. Restriktionen wie Take-or-Pay-Verträge und Fernwärmeversorgungspflichten können dazu führen, dass das Kraftwerk fahren muss, obwohl hierdurch ein negatives Ergebnis erzielt wird. In diesem Fall bestimmt die Einsatzoptimierung die Fahrweise, die den Verlust minimiert. Im Allgemeinen bestimmt die Einsatzoptimierung den wirtschaftlich vorteilhaftesten Fahrplan, der alle technischen und vertraglichen Restriktionen, die mit dem Kraftwerksbetrieb verbunden sind, erfüllt. (de)
  • The unit commitment problem (UC) in electrical power production is a large family of mathematical optimization problems where the production of a set of electrical generators is coordinated in order to achieve some common target, usually either matching the energy demand at minimum cost or maximizing revenue from electricity production. This is necessary because it is difficult to store electrical energy on a scale comparable with normal consumption; hence, each (substantial) variation in the consumption must be matched by a corresponding variation of the production. Coordinating generation units is a difficult task for a number of reasons: * the number of units can be large (hundreds or thousands); * there are several types of units, with significantly different energy production costs and constraints about how power can be produced; * generation is distributed across a vast geographical area (e.g., a country), and therefore the response of the electrical grid, itself a highly complex system, has to be taken into account: even if the production levels of all units are known, checking whether the load can be sustained and what the losses are requires highly complex power flow computations. Because the relevant details of the electrical system vary greatly worldwide, there are many variants of the UC problem, which are often very difficult to solve. This is also because, since some units require quite a long time (many hours) to start up or shut down, the decisions need be taken well in advance (usually, the day before), which implies that these problems have to be solved within tight time limits (several minutes to a few hours). UC is therefore one of the fundamental problems in power system management and simulation. It has been studied for many years, and still is one of the most significant energy optimization problems. Recent surveys on the subject count many hundreds of scientific articles devoted to the problem. Furthermore, several commercial products comprise specific modules for solving UC, such as PLEXOS, or are even entirely devoted to its solution. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 60 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software