About: Trans Austria Gas Pipeline     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:WikicatNaturalGasPipelinesInAustria, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FTrans_Austria_Gas_Pipeline

The Trans Austria Gas (TAG) pipeline is a natural gas pipeline that leads from the Slovak-Austrian border at Baumgarten an der March to Arnoldstein in the south, near the border with Italy. Natural gas originating from Russia is transported to and used in Italy and Austria. In addition, it supplies Slovenia through the SOL Pipeline System (Süd - Ost - Leitung), which branch-off at Weitendorf.

AttributesValues
rdf:type
rdfs:label
  • Trans Austria Gasleitung
  • Trans Austria Gas Pipeline
  • Trans Austria Gas Pipeline
rdfs:comment
  • Die Trans Austria Gasleitung (TAG) ist eine Erdgaspipeline, die von der slowakisch-österreichischen Grenze bei Baumgarten an der March, wo zum Ausgleich von Lieferschwankungen ein Untergrundspeicher betrieben wird, durch Niederösterreich, Burgenland, Steiermark und Kärnten an die italienisch-österreichische Grenze bei Arnoldstein führt. Das aus Russland stammende Erdgas dient hauptsächlich der Versorgung der norditalienischen Industriegebiete, österreichischer Bundesländer und Sloweniens.
  • The Trans Austria Gas (TAG) pipeline is a natural gas pipeline that leads from the Slovak-Austrian border at Baumgarten an der March to Arnoldstein in the south, near the border with Italy. Natural gas originating from Russia is transported to and used in Italy and Austria. In addition, it supplies Slovenia through the SOL Pipeline System (Süd - Ost - Leitung), which branch-off at Weitendorf.
  • I gasdotti Trans Austria Gas (TAG 1 e TAG 2) trasportano gas naturale dal confine Slovacchia - Austria presso Baumgarten an der March fino a Arnoldstein nel sud dell'Austria, vicino al confine con l'Italia. Il gas naturale proveniente dalla Russia è trasportato e consumato in Italia e Austria. La compagnia che gestisce il gasdotto è una joint-venture fra l'azienda italiana Eni e l'austriaca OMV. Eni ha avviato il processo di dismissione della sua partecipazione. Dal 2014 è parte di SNAM.
name
  • Trans Austria Gas Pipeline
foaf:isPrimaryTopicOf
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
country
direction
  • east-west
length km
map caption
  • Location of Trans Austria Gas Pipeline
operator
  • Trans Austria Gasleitung GmbH
partners
start
type
  • natural gas
discharge
has abstract
  • Die Trans Austria Gasleitung (TAG) ist eine Erdgaspipeline, die von der slowakisch-österreichischen Grenze bei Baumgarten an der March, wo zum Ausgleich von Lieferschwankungen ein Untergrundspeicher betrieben wird, durch Niederösterreich, Burgenland, Steiermark und Kärnten an die italienisch-österreichische Grenze bei Arnoldstein führt. Das aus Russland stammende Erdgas dient hauptsächlich der Versorgung der norditalienischen Industriegebiete, österreichischer Bundesländer und Sloweniens.
  • The Trans Austria Gas (TAG) pipeline is a natural gas pipeline that leads from the Slovak-Austrian border at Baumgarten an der March to Arnoldstein in the south, near the border with Italy. Natural gas originating from Russia is transported to and used in Italy and Austria. In addition, it supplies Slovenia through the SOL Pipeline System (Süd - Ost - Leitung), which branch-off at Weitendorf.
  • I gasdotti Trans Austria Gas (TAG 1 e TAG 2) trasportano gas naturale dal confine Slovacchia - Austria presso Baumgarten an der March fino a Arnoldstein nel sud dell'Austria, vicino al confine con l'Italia. Il gas naturale proveniente dalla Russia è trasportato e consumato in Italia e Austria. I gasdotti paralleli sono lunghi circa 380 km circa. La prima linea è stata costruita negli anni 1973/1974 mentre la seconda linea negli anni 1987/1988, recentemente è divenuta operativa una estensione del gasdotto chiamata TAG Loop II, completata nel 2006/2007. In seguito, lungo la linea sono state disposte ulteriori 2 Centrali di Compressione ed eseguito il revamping delle esistenti, per aumentare la capacità nominale del metanodotto, nell'ambito del progetto TAG EXP 04 che si è concluso nel 2009. La compagnia che gestisce il gasdotto è una joint-venture fra l'azienda italiana Eni e l'austriaca OMV. Eni ha avviato il processo di dismissione della sua partecipazione. Il 10 giugno 2011 ENI cede l'89% delle azioni detenute in Trans Austria Gasleitung GmbH a Cassa Depositi e Prestiti per un totale di prezzo pari a 483 milioni di euro, oltre al rimborso di un finanziamento soci erogato da Eni alla società pari a circa 192 milioni di euro. La partecipazione è detenuta attraverso il veicolo CDP Gas S.r.l. (100% CDP). Dal 2014 è parte di SNAM.
finish
through
  • Eggendorf, Grafendorf, St. Margrethen, Weitendorf, Ettendorf, Waisenberg, Ebenthal, Finkenstein am Faaker See
prov:wasDerivedFrom
page length (characters) of wiki page
is foaf:primaryTopic of
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is Wikipage disambiguates of
Faceted Search & Find service v1.17_git51 as of Sep 16 2020


Alternative Linked Data Documents: PivotViewer | iSPARQL | ODE     Content Formats:       RDF       ODATA       Microdata      About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3319 as of Dec 29 2020, on Linux (x86_64-centos_6-linux-glibc2.12), Single-Server Edition (61 GB total memory)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2021 OpenLink Software