About: Spanish Moss Trail     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:WikicatRailTrailsInSouthCarolina, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FSpanish_Moss_Trail

The Spanish Moss Trail is a partially-completed, ten-mile multi-purpose rail trail in northern Beaufort County, South Carolina. Using the former Port Royal Railroad right-of-way now owned by Beaufort-Jasper Water and Sewer Authority, the dedicated trail follows a north–south path from Seabrook to Port Royal while passing through Burton and Beaufort. In 2020, Outside magazine named the trail one of the Top Urban Trails in the United States.

AttributesValues
rdf:type
rdfs:label
  • Spanish Moss Trail (en)
rdfs:comment
  • The Spanish Moss Trail is a partially-completed, ten-mile multi-purpose rail trail in northern Beaufort County, South Carolina. Using the former Port Royal Railroad right-of-way now owned by Beaufort-Jasper Water and Sewer Authority, the dedicated trail follows a north–south path from Seabrook to Port Royal while passing through Burton and Beaufort. In 2020, Outside magazine named the trail one of the Top Urban Trails in the United States. (en)
name
  • Spanish Moss Trail (en)
geo:lat
geo:long
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
trailheads
dbp:wikiPageUsesTemplate
length mi
location
season
  • Year round (en)
Use
  • Cycling, Walking, Hiking, Jogging, Inline Skating (en)
georss:point
  • 32.42666666666667 -80.69222222222223
has abstract
  • The Spanish Moss Trail is a partially-completed, ten-mile multi-purpose rail trail in northern Beaufort County, South Carolina. Using the former Port Royal Railroad right-of-way now owned by Beaufort-Jasper Water and Sewer Authority, the dedicated trail follows a north–south path from Seabrook to Port Royal while passing through Burton and Beaufort. Construction of the rail trail began in summer of 2012, with the first segment opening later that year. Once completed, the will be 14.9 miles (24.0 km). A second phase may extend 10.1 miles (16.3 km) to Yemassee. The Spanish Moss Trail is a segment of the East Coast Greenway. In 2020, Outside magazine named the trail one of the Top Urban Trails in the United States. (en)
difficulty
  • Flat, paved, 12 feet wide (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-80.692222595215 32.426666259766)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (62 GB total memory, 48 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software