The Shin'inotani Dam (新猪谷ダム, Shin'inotani Damu) is a dam in the city of Hida, Gifu Prefecture, Japan located on the Takahara River, part of the Jinzū River system. The dam is a concrete gravity dam with a height of 56 meters, and is operated by the Hokuriku Electric Power Company. The reservoir created is used by hydroelectric power generation for a total of 56,900 kW. The dam was completed in 1963.

AttributesValues
rdf:type
rdfs:label
  • 新猪谷ダム (ja)
  • Shin'inotani Dam (en)
rdfs:comment
  • The Shin'inotani Dam (新猪谷ダム, Shin'inotani Damu) is a dam in the city of Hida, Gifu Prefecture, Japan located on the Takahara River, part of the Jinzū River system. The dam is a concrete gravity dam with a height of 56 meters, and is operated by the Hokuriku Electric Power Company. The reservoir created is used by hydroelectric power generation for a total of 56,900 kW. The dam was completed in 1963. (en)
  • 新猪谷ダム(しんいのたにダム)は、岐阜県飛騨市、一級河川・神通川水系高原川に建設されたダム。高さ56メートルの重力式コンクリートダムで、北陸電力の発電用ダムである。同社の水力発電所・猪谷発電所・新猪谷発電所・新猪谷ダム発電所に送水し、合計最大5万6,900キロワットの電力を発生する。 (ja)
foaf:name
  • Shin'inotani Dam (en)
  • 新猪谷ダム (en)
name
  • Shin'inotani Dam (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Shin'inotani_Dam_right_view.jpg
location
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
thumbnail
location
opening
georss:point
  • 36.42861111111111 137.27944444444444
has abstract
  • The Shin'inotani Dam (新猪谷ダム, Shin'inotani Damu) is a dam in the city of Hida, Gifu Prefecture, Japan located on the Takahara River, part of the Jinzū River system. The dam is a concrete gravity dam with a height of 56 meters, and is operated by the Hokuriku Electric Power Company. The reservoir created is used by hydroelectric power generation for a total of 56,900 kW. The dam was completed in 1963. (en)
  • 新猪谷ダム(しんいのたにダム)は、岐阜県飛騨市、一級河川・神通川水系高原川に建設されたダム。高さ56メートルの重力式コンクリートダムで、北陸電力の発電用ダムである。同社の水力発電所・猪谷発電所・新猪谷発電所・新猪谷ダム発電所に送水し、合計最大5万6,900キロワットの電力を発生する。 (ja)
construction began
dam crosses
dam height
dam length
name official
  • 新猪谷ダム (en)
plant capacity
res capacity total
res catchment
res surface
vastest lake
part
river
gold:hypernym
building start year
prov:wasDerivedFrom
length (km)
page length (characters) of wiki page
building start date
  • 1961
height (μ)
length (μ)
opening year
country
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(137.27944946289 36.428611755371)
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3331 as of Sep 2 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 48 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software