Sela Tunnel is an under-construction road tunnel at 3,000 metres (9,800 ft) which will ensure all-weather connectivity between Guwahati in Assam and Tawang in the Indian state of Arunachal Pradesh. The tunnel is being excavated below the 4,200 metres (13,800 ft) Sela Pass in India on NH 13 component of Trans-Arunachal Highway system. It will be connected with NH 13 by a new 12.4 km road and will reduce the distance between Dirang and Tawang by 10 km. It has a 3-year target completion date of February 2022 after the construction commenced in 2019. The tunnel will provide access to Tawang by an all-weather road in the western region of Arunachal Pradesh throughout the year.

AttributesValues
rdf:type
rdfs:label
  • Sela Tunnel (en)
rdfs:comment
  • Sela Tunnel is an under-construction road tunnel at 3,000 metres (9,800 ft) which will ensure all-weather connectivity between Guwahati in Assam and Tawang in the Indian state of Arunachal Pradesh. The tunnel is being excavated below the 4,200 metres (13,800 ft) Sela Pass in India on NH 13 component of Trans-Arunachal Highway system. It will be connected with NH 13 by a new 12.4 km road and will reduce the distance between Dirang and Tawang by 10 km. It has a 3-year target completion date of February 2022 after the construction commenced in 2019. The tunnel will provide access to Tawang by an all-weather road in the western region of Arunachal Pradesh throughout the year. (en)
geo:lat
geo:long
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
georss:point
  • 27.4994 92.0938
has abstract
  • Sela Tunnel is an under-construction road tunnel at 3,000 metres (9,800 ft) which will ensure all-weather connectivity between Guwahati in Assam and Tawang in the Indian state of Arunachal Pradesh. The tunnel is being excavated below the 4,200 metres (13,800 ft) Sela Pass in India on NH 13 component of Trans-Arunachal Highway system. It will be connected with NH 13 by a new 12.4 km road and will reduce the distance between Dirang and Tawang by 10 km. It has a 3-year target completion date of February 2022 after the construction commenced in 2019. The tunnel will provide access to Tawang by an all-weather road in the western region of Arunachal Pradesh throughout the year. The project provides for two tunnels of 1,790 m and 475 m lengths and an escape tube of 980 m. Raksha Mantri Shri Rajnath Singh witnessed the breakthrough of Sela Tunnel in the Month of Sep 2021 and Dedicated it to the Nation. It was a Mile stone for BRO and commitment towards connecting even the remotest part of the Nation. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(92.093803405762 27.499399185181)
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 60 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software