The Sandstone Solar Energy Project was an up to 1,600 megawatt (MW) solar thermal power project with 16 gigawatt-hours of energy storage, planned just to the east of Tonopah, about 170 miles (270 km) northwest of Las Vegas. The project was about up to eight 200 MW solar towers with integrated molten salt energy storage technology. The project, developed by SolarReserve and owned by Sandstone Solar Energy, LLC. was anticipated to cost about $5 billion. Planned energy output is 5,600 GW·h per year.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Sandstone Energy 10X (fr)
- Sandstone Solar Energy Project (en)
|
rdfs:comment
| - The Sandstone Solar Energy Project was an up to 1,600 megawatt (MW) solar thermal power project with 16 gigawatt-hours of energy storage, planned just to the east of Tonopah, about 170 miles (270 km) northwest of Las Vegas. The project was about up to eight 200 MW solar towers with integrated molten salt energy storage technology. The project, developed by SolarReserve and owned by Sandstone Solar Energy, LLC. was anticipated to cost about $5 billion. Planned energy output is 5,600 GW·h per year. (en)
- Sandstone Energy 10X désigne un projet de centrale solaire thermodynamique porté par la compagnie californienne SolarReserve. La centrale doit se situer dans le désert du Nevada. Elle reprend la même technologie que la déjà construite par la même entreprise mais change d'échelle : avec dix tours solaires, la puissance électrique générée doit atteindre deux gigawatts. Le début de la construction est prévue en 2021 et la mise en service environ cinq ans plus tard. La construction de la centrale coûtera 5 milliards de dollars, mais la compagnie espère produire de l'électricité au prix du marché. Un stockage d'énergie thermique, sous forme de réservoirs de sels fondus, permettra de prolonger la production après le coucher du soleil, aux heures où la demande d'électricité est maximale. La cen (fr)
|
foaf:name
| - Sandstone Solar Energy Project (en)
|
foaf:homepage
| |
name
| - Sandstone Solar Energy Project (en)
|
geo:lat
| |
geo:long
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
solar csp technology
| |
solar site resource
| |
solar type
| |
dbp:wikiPageUsesTemplate
| |
cost
| |
country
| |
location
| |
owner
| - Sandstone Solar Energy, LLC (en)
|
status
| |
website
| |
commissioned
| |
georss:point
| |
has abstract
| - Sandstone Energy 10X désigne un projet de centrale solaire thermodynamique porté par la compagnie californienne SolarReserve. La centrale doit se situer dans le désert du Nevada. Elle reprend la même technologie que la déjà construite par la même entreprise mais change d'échelle : avec dix tours solaires, la puissance électrique générée doit atteindre deux gigawatts. Le début de la construction est prévue en 2021 et la mise en service environ cinq ans plus tard. La construction de la centrale coûtera 5 milliards de dollars, mais la compagnie espère produire de l'électricité au prix du marché. Un stockage d'énergie thermique, sous forme de réservoirs de sels fondus, permettra de prolonger la production après le coucher du soleil, aux heures où la demande d'électricité est maximale. La centrale comportera 100 000 héliostats. (fr)
- The Sandstone Solar Energy Project was an up to 1,600 megawatt (MW) solar thermal power project with 16 gigawatt-hours of energy storage, planned just to the east of Tonopah, about 170 miles (270 km) northwest of Las Vegas. The project was about up to eight 200 MW solar towers with integrated molten salt energy storage technology. The project, developed by SolarReserve and owned by Sandstone Solar Energy, LLC. was anticipated to cost about $5 billion. Planned energy output is 5,600 GW·h per year. The project includes heliostats that collect and focus the sun's thermal energy to heat molten salt flowing through a solar power tower. The molten salt circulates from the tower to a storage tank, where it is then used to produce steam and generate electricity. Excess thermal energy is stored in the molten salt and can be used to generate power for up to ten hours, including during the evening hours and when direct sunlight is not available. The storage technology also eliminates the need for any backup fossil fuels, such as natural gas. Estimated construction start was in 2022. Each tower was constructed within a 24-month construction cycle, staggered 6 months, expecting about 5 and half years to complete. In March 2019, the U.S. Bureau of Land Management confirmed that Sandstone Solar Energy has withdrawn its application for a construction and operation right-of-way on federal land for this project. On 15 April 2019, Sandstone Solar Energy filed for withdrawal of the application for a permit to construct the solar plant and requested closure of the relevant docket (No.17-08003). The Commission acknowledged the filing and closed the docket the same day. (en)
|
ps annual generation
| |
ps electrical cap fac
| |
ps electrical capacity
| |
ps storage capacity
| |
ps units planned
| |
building start year
| |
capacity factor
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
building start date
| |
status
| |
owner
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(-116.69999694824 37.900001525879)
|
is Link from a Wikipage to another Wikipage
of | |
is Wikipage disambiguates
of | |
is foaf:primaryTopic
of | |