About: San Leandro Tech Campus     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : geo:SpatialThing, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FSan_Leandro_Tech_Campus

The San Leandro Tech Campus is a business park being constructed by Westlake Development Partners LLC in downtown San Leandro, California, near the San Leandro BART station. Construction of Phase 1 of the project began in 2014, and was completed in 2016. The primary tenant of the first phase of construction is OSIsoft, a software company based in San Leandro. Phase 2 of the project is expected to be completed in 2019 with Ghirardelli Chocolate Company as the lead tenant.

AttributesValues
rdf:type
rdfs:label
  • San Leandro Tech Campus (en)
rdfs:comment
  • The San Leandro Tech Campus is a business park being constructed by Westlake Development Partners LLC in downtown San Leandro, California, near the San Leandro BART station. Construction of Phase 1 of the project began in 2014, and was completed in 2016. The primary tenant of the first phase of construction is OSIsoft, a software company based in San Leandro. Phase 2 of the project is expected to be completed in 2019 with Ghirardelli Chocolate Company as the lead tenant. (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/BART_parking_lot_at_San_Leandro_station,_January_2018.jpg
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
thumbnail
georss:point
  • 37.721565 -122.161957
has abstract
  • The San Leandro Tech Campus is a business park being constructed by Westlake Development Partners LLC in downtown San Leandro, California, near the San Leandro BART station. Construction of Phase 1 of the project began in 2014, and was completed in 2016. The primary tenant of the first phase of construction is OSIsoft, a software company based in San Leandro. Phase 2 of the project is expected to be completed in 2019 with Ghirardelli Chocolate Company as the lead tenant. The site is the permanent location for the sculpture Truth is Beauty by Marco Cochrane. The sculpture generated some controversy, as it is a large (55 ft (17 m) tall) nude outdoor sculpture, albeit on private property. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-122.16195678711 37.721565246582)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (62 GB total memory, 50 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software