In project management, resources are required to carry out the project tasks. These can be people, equipment, facilities, funding, or anything else capable of definition (usually other than labour) required for the completion of a project activity. The lack of a resource will therefore be a constraint on the completion of the project activity. Resources may be storable or non storable. Storable resources remain available unless depleted by usage, and may be replenished by project tasks which produce them. Non-storable resources must be renewed for each time period, even if not used in previous time periods.

AttributesValues
rdfs:label
  • リソース (プロジェクト管理) (ja)
  • Resource (project management) (en)
rdfs:comment
  • リソース (英: resource)は、プロジェクト管理では人、設備、施設、資金、およびその他プロジェクト活動の完了に必要な資源(通常は労働以外)のことを指す。 プロジェクト管理では、プロジェクトタスクを実行するためのリソースが必要となる。したがって、リソースの不足は、プロジェクト活動の制約となる。リソースは備蓄可能なものとそうでないものがある。備蓄可能なリソースは、使い果たされない限り利用可能なままであり、それらを生成するプロジェクトタスクによって補充することができるが、備蓄できないリソースは、前の期間に使用されていなくても、期間ごとに調達する必要がある。 リソースのスケジューリング、利用可能性、最適化は、プロジェクト管理を成功させるための鍵と見なされる。 リソースは、各プロジェクト活動に与えられた優先順位に基づいて限定的に割り当てられる。優先度は、クリティカルパス法とヒューリスティック分析を使用して計算される。 リソースの数に制約がある場合は、可能な限り最も効率的なスケジュールを作成する必要がある。つまり、プロジェクトの期間を最小限に抑え、利用可能なリソースを最大限に活用することである。 (ja)
  • In project management, resources are required to carry out the project tasks. These can be people, equipment, facilities, funding, or anything else capable of definition (usually other than labour) required for the completion of a project activity. The lack of a resource will therefore be a constraint on the completion of the project activity. Resources may be storable or non storable. Storable resources remain available unless depleted by usage, and may be replenished by project tasks which produce them. Non-storable resources must be renewed for each time period, even if not used in previous time periods. (en)
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
has abstract
  • In project management, resources are required to carry out the project tasks. These can be people, equipment, facilities, funding, or anything else capable of definition (usually other than labour) required for the completion of a project activity. The lack of a resource will therefore be a constraint on the completion of the project activity. Resources may be storable or non storable. Storable resources remain available unless depleted by usage, and may be replenished by project tasks which produce them. Non-storable resources must be renewed for each time period, even if not used in previous time periods. Resource scheduling, availability and optimisation are considered key to successful project management. Allocation of limited resources is based on the priority given to each of the project activities. Their priority is calculated using the Critical path method and heuristic analysis.For a case with a constraint on the number of resources, the objective is to create the most efficient schedule possible - minimising project duration and maximising the use of the resources available. (en)
  • リソース (英: resource)は、プロジェクト管理では人、設備、施設、資金、およびその他プロジェクト活動の完了に必要な資源(通常は労働以外)のことを指す。 プロジェクト管理では、プロジェクトタスクを実行するためのリソースが必要となる。したがって、リソースの不足は、プロジェクト活動の制約となる。リソースは備蓄可能なものとそうでないものがある。備蓄可能なリソースは、使い果たされない限り利用可能なままであり、それらを生成するプロジェクトタスクによって補充することができるが、備蓄できないリソースは、前の期間に使用されていなくても、期間ごとに調達する必要がある。 リソースのスケジューリング、利用可能性、最適化は、プロジェクト管理を成功させるための鍵と見なされる。 リソースは、各プロジェクト活動に与えられた優先順位に基づいて限定的に割り当てられる。優先度は、クリティカルパス法とヒューリスティック分析を使用して計算される。 リソースの数に制約がある場合は、可能な限り最も効率的なスケジュールを作成する必要がある。つまり、プロジェクトの期間を最小限に抑え、利用可能なリソースを最大限に活用することである。 (ja)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is Wikipage disambiguates of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 51 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software